Insulation on Externals done

We completed the insulation of the external walls downstairs, at least there is light at the end of the tunnel!
Also there was a double socket, a network box and phone socket to be installed in the wall, the noggings for these site about 25mm back from the face of the studding. Nearly took the head off myself when the blade of the reciprocating saw snapped and went flying!
The walls between the kitchen and utility needed to be tied to the floor joists for the strenght, managed to get this done also.