back to grouting

Grouting to be finished in the kitchen and the white grout in the bathroom to be redone. Slow job but that is the last large job done.

back to grouting

Grouting to be finished in the kitchen and the white grout in the bathroom to be redone. Slow job but that is the last large job done.

back to grouting

Grouting to be finished in the kitchen and the white grout in the bathroom to be redone. Slow job but that is the last large job done.

September 10, 2006

2 matches in 1 day

Today was a late one, I had my first match at 12pm for the C team but the ref was late and we did not start until 20 past. So after a mad busy match we won 2-1.
The that finished at 2pm, I got my packet of Jaffa cakes and had 10 minutes of rest before I went out for the warm up again.
The B team game kicked off at 2.30pm and near the end I got cramp, but again we won this 1-0. So I could be he first to get 6 points in one day!!!
Back to the house and the final coats of the stairs!

September 09, 2006

Drill it

Over about 8am, I gave the stairs another coat and then into town to get the Core bit and drill from Sam Hire for 30 euro to drill through the wall for the tumble drier vernt.
Took about 1hour to get through the block but then I hit one of the studs in the wall so had to cut around this also.
Eventually got a 4" sewage pipe in for the vent.
Then had to drill a section out for the vent from the machine, pain in the head all this.
Took me near the whole day to finish this job.
Got another coat on the stairs and one coat on the back bedroom door.
Off home about 8pm.

September 04, 2006

Days of varnish

Started varnishing the spindsles again, slow job only 10 done! Gave the stairs another coat
Varnishing!!!!

5th - No training so finished off the remaining 15 spindles and gave a coat to the steps
6th - Varnish varnish varnish!!! cat slow but it has to be done
7th - varnish stairs after training
8th - Varnish stairs and saddles, finally getting there now with this, pulled ship at about 12.30am. Varnishing near the end at the weekend.

September 03, 2006

Skin sanding

Over for 7.30, sanding again, lose the skin on my fingers at this stage!! all sanding of the steps done bar 2.
Gave the done steps a coat of varnish, off to a match then

September 02, 2006

Sand, sand more sand

A day of sanding and sanding and more sanding!! From 7am to 8pm. I had a "mouse" sander so that was excellent for the steps.

September 01, 2006

Sanding

Started to sandt the spindles with over 50 and it taking 15 minutes each this is gone to be slow!!
Dad was over shelving