July 25, 2005

Continue the NW

I completed the runs for the CAT6 cabling to the 2nd bedroom and the bedroom downstairs.

I also continued with plumbing of the walls, screwing up into the ceiling joists.

NO sign of the tradesmen today so no plumbing (with pipes) and no slates.

The insulation arrived today also, rockwool and fibre glass, filled the sitting room, wall to wall and floor to roof, we will have some fun!!

Also a point to note for timber framers imparticular is that there seems to be a lot of noggings to put in, also what i was finding that I had to add timber strips or lathes along the tops of the studding so that when you put the plasterboarding up it had something to screw into, also the back of the studding needed the same strips.