Another day more pipe, getting to the end of it and the move towards screeding is pushed on. Dad was over and Siobhan was upstairs painting, getting used to it now at this stage!!

Myself and dad setout the sitting room, 2 separate zones with 2 different widths of separation between them so we had to make sure we got it right.

Next in line was the bathroom with the tight loops and missing sections for toilet and handbasin and that room was pulled in, another issue with the bathroom is that is shares a zone with the back of the hall.
So once we had that down it was a matter of measuring off the to-scale drawings and fitting the pipes in the hall, again different separation and back to the manifold.

Then onto the kitchen, there were gaps left for the island and kitchen units, another zone was to cover the top of the kitchen and looped into the utility room.
It has to be left until Brian Cooley from Climate Control arrives to install the feed and return pipes for the Geothermal collector bed.