April 02, 2006

Continued with the big bathroom

Got up @ 7.30 and headed over. I decided that I would add the border all the way around and another tile on top. That would leave me with 2 tiles all the way around.
Very adward around the glass blocks and also the cuts around the windows. I had a match thrown in during the middle of the day.
We are looking at about 3/4 done but I am quickly running out of tiles.

No comments: