September 27, 2017

For about 2 years I've promised to kids to get them a swing. So eventually this year I managed to get the will to do it!
After much zipping around the internet I managed to find a place to deliver to Ireland. I purchased pretty heavy duty stuff with chains, rubber seats, solid slide etc.

So I then went on the web and came up with a plan which I redrew 20 times later! :)

The cost of the items below came to around 320 euro delivered
4m slide
2 swing sets
1 climbing block set
1 set of steering wheel, telescope
3 sets of support handles.
Trapeze set


I then had to purchase the timber. I wasn't sure if I'd go with round or square poles and the thickness of these, but I visited a few places who sold these frames and took a few measurements.
In the end I went with square for most but round for the upright.
The main sq supports are 130mm square.
I purchased a few boxes of 150mm coach screws and these are pigs to put in, each one hand wrenched into place!

But after the guts of 3 days to cut it and piece it we delivered it to the kids and they are delighted.

In total something around 600-650 all in.
To buy it with the quality of goods and timber you'd do well to get it for 1500 euro.

Now to paint it!!!!




Garage clean up and painting the floor

The bigger the garage the more you store they say... well its true. I spent 9 hours sorting out the shelves and floor and sweeping, and it still looks a mess, I know! :)

Then my buddy was painting his, so I borrowed the floor sander and also go some paint.

Cleared out the garage of anything I could bump into, spend the next 3 hours with the sander and raised a ton of dust!! My 4 and 6 year old were hoover engineers for the day! :)

Mix was 2.5 litres paint, 2 litres of thinners and 1/4 litre of hardener, mix it up and roll it on. It took around 2 hours to complete the first coat.
Then on Saturday I went and did the final coat, the same as above but without the thinners.

It has left a really good solid floor where water pools and can easily be wiped off.



Tarmac done

I got the tarmac finally finished after a 9 years battle with Tegral to replace my slates which are a complete disgrace. Slates are fading and down to 2mm in thickness in spots but they have it all their own way so small fish have no chance against them.

Got Moran Tarmacadam who did a top job.

Michael O'Malley services did the ground works and drainage.







September 26, 2011

Roller door

If the budget fits I am looking at getting an insulated roller door with automation. Pricing around so far I am looking at 700 euro supply on to 1050 euro supply and fit.

Anyone use an company for theirs?


Shed


After 3 years of thinking I finally got the plans done and the planning in for the shed in May.

Then in the last few weeks I got going. Sean did the raft with me one Tuesday and we had it in in about 4 hours. 12m of concrete went into it.

I got a lad I know from home to do the blocks and they have so far spent 3 days there and then last Saturday working with Dad and Sean, Liam and myself put in the ceiling joists.
We spent a couple of hours on Sunday levelling the roof.














April 01, 2011

New lawnmower

Well, long time since I posted on here!!
A lot has happened in both garden, house, work and family!

The garden is getting there, we had our first crop of vegtables last season.

All the lawn is sown, the wall is complete and the site has a shape at last!

My brother is making me 82 concrete stakes to put in along the railway line! :)

Any of course most important we had a new arrival in the house, he is 12 weeks old today!

And a new lawnmower arriving today also! :) Took me 3hrs 20 mins non stop to cut the lawn! Mental really when you think of it. So I had to buy one! :)

Will post up pics when I take a few more! :)

New lawnmower

Well, long time since I posted on here!!
A lot has happened in both garden, house, work and family!

The garden is getting there, we had our first crop of vegtables last season.

All the lawn is sown, the wall is complete and the site has a shape at last!

My brother is making me 82 concrete stakes to put in along the railway line! :)

Any of course most important we had a new arrival in the house, he is 12 weeks old today!

And a new lawnmower arriving today also! :) Took me 3hrs 20 mins non stop to cut the lawn! Mental really when you think of it. So I had to buy one! :)

Will post up pics when I take a few more! :)

November 05, 2009

Paving & Garden Wall

Currently looking at getting some work done at the back of the house as the front border is near finished. I am waiting for Michael and Sean to come back to me to put in a load of soil in the corner near the road and we will then finish off the panels to the railway line.

My next plan WAS to get the rest of the lawn done but with the amount of rain we have had over the last week there really is little hope of me getting that done now.

So what I have earmarked to look (and do if its not too mental dear) is to built a 3ft high and probably 40ft long, not sure on the lenght yet but again depending on price I will create a "flower box" wall all along the back. What I am look at is something like this in the pictures below. I am still trying to source where the stone/paving was got but no joy so far.

I suspect it COULD be either tobermore or Archeson so I have enquired about prices. But as I said this could be well shot down if it turns out mental pricey bt it would look well I think.
The paving is more a long term thing, until the shed is done I really can't do all 3 sides of the house but I could probably do along the railway side, along the deck and to the back of the house in line with the back door. Again this is pricing stage but would add a wee bit of character to the back of the house.
Looking at various sites there are loads of good ideas out there which might be of interest.
I will put up a post when I get more details and prices.








November 03, 2009

DIY Conservatories

I have been looking into self build conservatories lately. DIY conservatories are pretty much that - conservatories that you build yourself, or have your own professional builder put up. In this case like everything in the house we will probably do this ourselves.

The beauty in the self build conservatory is the money that you save by buying the product directly from the manufacturer, and not having to pay a middleman. After all, most of us already have either the skills, or for others will have a local builder that we go to.

These guys provide DIY conservatories in various designs, from the simple lean to (or sun lounger) conservatory, to the more elegant Victorian, Edwardian, Georgian and Gabled ended. Or you can even combine the styles to create your own bespoke conservatory. The most popular material is uPVC, which has many benefits over timber and aluminium for home conservatories. There have been many advances in uPVC and you can now get it in a wide range of colours (not just white) and woodgrain to help it blend in with your existing home.

From my own research, I would recommend buying directly from a DIY conservatory specialist. They are geared up for these sort of projects and will provided me with a free conservatory quote. They also said they would provide support, both online and over the phone, during the build. There is also a finance option but you should not settle for a warranty less than 10 years.

May 10, 2009

Steam Train

Was out on the deck this morning reading the paper andI heard the "chooo" of the steam train that passed last evening. 

Never seen one bar last nite and was luck to get it this time!!!!

Video is only from my phone but is ok.


September 22, 2008

Some advertising :)

Said I had better give our own company a push on here especially with the downturn, who knows someone might be interested in some Estimating or Financial software for their construction company. We are specific currently to the UK and Ireland markets but this will broaden over time so if anyone outside of this area want to look at it no problems.

We have had enquiries from Sweden and Greece also which we will look into. Also Canada and the USA have expressed an interest.

The links are below:


Thanks :)

August 23, 2008

A little stone picking

Spent 2 hours picking stones. Weather is unreal bad at the moment. I manged to get out to cut the new (er) lawn last night, took a good 40 minutes and that was without collection of the lawn grass.
I am thinking that to get a full cut of 2 two lawns as they stand I will be looking at the guts of over an hour and that is still without almost the same amount of area to be stoned yet.

I managed to get another area, about 30ft sq stone gathered and the grass seed down. Still a good few hours to be done to close off that section, especially when you only have a wheel barrow and rake.

The lad John who did he deck with me is going to now do his daughters, she saw ours and loved it! So had to go a calling to Fergal again!!!!

August 01, 2008

All done!

Well its done, great job!
Dad and John were over and installed the handrail and spindle frames they made up last night. And also installed the timber seat.

It looks very well I have to say. Now its my job to sand the handrail and varnish!!

Have to go tomorrow and buy the kit to install the outdoor lights.

Pics are taken at dusk, so not the best!!!!!





July 31, 2008

Getting there

The lads came over and completed the rest of the deck and put down the skirt around the sides of the deck.
They measured up the sides now for the spindles and handrails.

I installed the rest of the lights so all that is done, need to get an external box now, 2 four gang sockets and and external socket for under the seat! Just in case!!!!

The lights look well now when on!!

July 30, 2008

Day 4 - All decking down

The lads were over again today.
They did very well completing another section of the deck boards.

AS you can see the rain drove them home today, at the end of the day they are doing me a massive favour so I was not going to argue!!!!!

You can get a better idea of the pattern now and the lights from the pictures below.

Problem with the washing machine, not sure what, its outside now for some "operation" :)

Could be the brushes!!!!






July 29, 2008

Day 3 - In the deck brother house hold

John and Dad were over again, finished off the final noggings and started the decking of section 1.
I called back to them at lunch and they were making great progress. Made the lads their soup and headed back.
When I came back they had all section 1 done. I was delighted. Then my job was, on crutches, to get the lights in section 1 installed. I decided that the transformers were going to be installed in the corner. I over the period of about 3 hours I installed the cabling for all 5 transformers, you can see the black cables below in the picture.

Each transformer has 4 lights in it. Each light has a 3m cable run to the "housing" on the end of the cable which returns to the transformer, these cables are 12m in lenght.

So by the end of today I had some of the lights installed also.



July 27, 2008

Decking Day 2

Was out for a bit of food last night with my sister and brother-in-law. Went to The Plaza,top notch food and the wine was not bad either ;)

So did not rise until 10am. Bit late I know!!! :)

So the idea today was to tighten down the deck, put the legs and nogging in place and the posts up.
My ankle was playing up today so it slowed me down big time. I decided that I would cover each of the feet with a dpc, stapled onto it. I had some left over. You can see what I did in the photos below.

With all the legs in and the noggings cut out we progressed to also nailing these in, while we had the nail gun.



The seat also went in today. The idea was to have a little table in the corner. The seat is 14ft long.


The posts are all bolted in, and noggings to the side of each, to totally secure them

I had to retire early so John and Dad worked away until 5pm

July 26, 2008

Decking day 1

Dad and John were due at 10am. I was at this stage meant to have got the nails, wood protector, nail gun, nails, brackets etc! But on crutches I was meant to be off! No chance.

Into the car, dumped the crutches and hobbles around NCF and Heiton buckleys for the stuff.

Paslode nails 48 euro. Deck screws, 60mm, were 21 euro for 500.
100mm wire nails were a tenner. 12" bolts were 30 cents each.

Nail gun to rent per day, 40 euro in Castlebar, 25 in Westport (Duffy plant hire), figure that out!

Anyway the lads got there and we started.

Supplies wise.

I got 37 joists, 88 deck boards, 8 lenghts of handrails, 88 spinds and 8 posts. Dad and John had taken the spinds and post and routed them witha pattern for effect and they looked well.

So we decided on 3 sections, about 8ft * 14ft each. Middle section running the opposite way, this mean that the centre joists were 2400mm long, meaning that out of joists 4800mm long we got 2 centres.
Joists onto the walls were express nailed in, with a drop of 1" fall outwards. Then the lads started cutting like hell with the chop saw while I measured and hobbled around, Dad given out every few minutes!!!!

Anyway as you can see we progress very well on day one, no supports or noggings. Thats tomorrow!!!
Off for me to get the ice!! and work out the lights.

I bought 20 LED deck lights off ebay for 142 euro. Not bad :)
It wil be a setup of 4 lights on each transformer.

More on that later

A close view from the door

3 separate frames, as you can the middle one will be the opposite direction

The corner was cut off to take the edge off it. Note the lawn growing in the back ground :)

View from the sun room door. Noggings and legs to go in yet.



July 24, 2008

Bit of a disaster

After about 2 months in the planning and help in place I decided to do the ligaments in my ankle tonite.
Very easy done, I pushed off after giving a bad pass and as I did my ankle went down into a hole in the ground and cracked. I knew straight away that things were not good as the tingling it in was weird and I had no feeling.

I had also bought a bike from my mate Adrian, he was to leave it to me tonite and I was to cycle it home. Idea is to cycle to work, 5.5 miles each way. It would help to reduce the weight, as 4 months out with a groin injury was no help.

So up to A&E and out in 30 mins with crutches, "keep it up for a few days, on crutches for 2 weeks and out for 6-8" , great!!!!

SO I rang the lads to cancel but they were adamant that they were going to work!!!!

July 17, 2008

Another day of stones

After about 4 attempts today we managed to get the machine and rake another section of the site, the area is about 100ft long by about 30/50 ft wide at its widest.
Myself and Michael got stuck in and Dad arrived about 10.30am, fair play to him after doing the papers.
Gerry was due to arrive also but did not manage it due to drink commitments the previous, but he arrived at 2pm and that helped push on the job.
We actually got through it fairly fast, unfortunatley my cracked rib was killing me but had to bear it to get the work done.
So Michael or his Dad Sean raked with the machine and then we pulled back the small stones.
The lads had to go at 4pm and I managed to rid of Dad then also as I could see he was struggling and he had a days work done before he ever arrived.
So what was done today about 1/2 of what was orginally left. Sean called over about 7pm and we seeded what was done.
I then watered it and put up the "Bird protectors" :) Also known as strips of plastic on a stick!!!!
While I was outside I also measured up for the deck, after a year of promising the funds were there to do the work and I started to price around.
For 24 sqm of deck, I was getting quotes of about 1000 euro, thats for standard posts, spindles etc.
I was away with a friend of mine in Rome at a wedding and we got talking about what I was doing, he is is involved with timber processing and he needed me to do some website work for him so we "bartered" :)
Anyway, when he got back he got me a quote of 540!!!! I near died!
So when I heard that I decided to "grow the deck a little!! So now its gone to near 33 sqm.
Deck is 14ft wide, 24ft long and the creeps around the back of the house.
Dad and John are going to be involved again.
I tiled Johns daughters house as payback for all the work he did here.
I will throw up a few pics of it below.


Pretty poor pic of the lawn but you get the idea :)


Simple tiling here, but she liked the idea of the brick effect. Instead of individual borders we just cut large mosaic tiles into strips. Cheaper option


Just another different view.
This was one of 2 bathrooms and then 24 sq yards of kitchen floor.