John and Dad were over again, finished off the final noggings and started the decking of section 1.
I called back to them at lunch and they were making great progress. Made the lads their soup and headed back.
When I came back they had all section 1 done. I was delighted. Then my job was, on crutches, to get the lights in section 1 installed. I decided that the transformers were going to be installed in the corner. I over the period of about 3 hours I installed the cabling for all 5 transformers, you can see the black cables below in the picture.
Each transformer has 4 lights in it. Each light has a 3m cable run to the "housing" on the end of the cable which returns to the transformer, these cables are 12m in lenght.
So by the end of today I had some of the lights installed also.