A diary of our self build In Co. Mayo Ireland. Blog. Covering all aspects of building your own house. Timber frame house, insulation, underfloor heating, geothermal, tiling, timber floors, doors, varnish, painting and slogging it out!!!!
September 11, 2006
back to grouting
Grouting to be finished in the kitchen and the white grout in the bathroom to be redone. Slow job but that is the last large job done.
back to grouting
Grouting to be finished in the kitchen and the white grout in the bathroom to be redone. Slow job but that is the last large job done.
back to grouting
Grouting to be finished in the kitchen and the white grout in the bathroom to be redone. Slow job but that is the last large job done.
September 10, 2006
2 matches in 1 day
Today was a late one, I had my first match at 12pm for the C team but the ref was late and we did not start until 20 past. So after a mad busy match we won 2-1.
The that finished at 2pm, I got my packet of Jaffa cakes and had 10 minutes of rest before I went out for the warm up again.
The B team game kicked off at 2.30pm and near the end I got cramp, but again we won this 1-0. So I could be he first to get 6 points in one day!!!
Back to the house and the final coats of the stairs!
The that finished at 2pm, I got my packet of Jaffa cakes and had 10 minutes of rest before I went out for the warm up again.
The B team game kicked off at 2.30pm and near the end I got cramp, but again we won this 1-0. So I could be he first to get 6 points in one day!!!
Back to the house and the final coats of the stairs!
September 09, 2006
Drill it
Over about 8am, I gave the stairs another coat and then into town to get the Core bit and drill from Sam Hire for 30 euro to drill through the wall for the tumble drier vernt.
Took about 1hour to get through the block but then I hit one of the studs in the wall so had to cut around this also.
Eventually got a 4" sewage pipe in for the vent.
Then had to drill a section out for the vent from the machine, pain in the head all this.
Took me near the whole day to finish this job.
Got another coat on the stairs and one coat on the back bedroom door.
Off home about 8pm.
Took about 1hour to get through the block but then I hit one of the studs in the wall so had to cut around this also.
Eventually got a 4" sewage pipe in for the vent.
Then had to drill a section out for the vent from the machine, pain in the head all this.
Took me near the whole day to finish this job.
Got another coat on the stairs and one coat on the back bedroom door.
Off home about 8pm.
September 04, 2006
Days of varnish
Started varnishing the spindsles again, slow job only 10 done! Gave the stairs another coat
Varnishing!!!!
5th - No training so finished off the remaining 15 spindles and gave a coat to the steps
6th - Varnish varnish varnish!!! cat slow but it has to be done
7th - varnish stairs after training
8th - Varnish stairs and saddles, finally getting there now with this, pulled ship at about 12.30am. Varnishing near the end at the weekend.
Varnishing!!!!
5th - No training so finished off the remaining 15 spindles and gave a coat to the steps
6th - Varnish varnish varnish!!! cat slow but it has to be done
7th - varnish stairs after training
8th - Varnish stairs and saddles, finally getting there now with this, pulled ship at about 12.30am. Varnishing near the end at the weekend.
September 03, 2006
Skin sanding
Over for 7.30, sanding again, lose the skin on my fingers at this stage!! all sanding of the steps done bar 2.
Gave the done steps a coat of varnish, off to a match then
Gave the done steps a coat of varnish, off to a match then
September 02, 2006
Sand, sand more sand
A day of sanding and sanding and more sanding!! From 7am to 8pm. I had a "mouse" sander so that was excellent for the steps.
September 01, 2006
Sanding
Started to sandt the spindles with over 50 and it taking 15 minutes each this is gone to be slow!!
Dad was over shelving
Dad was over shelving
August 28, 2006
Flu's out
I could not get out of bed today, the flu has hit me like a wall!! The container has arrived, Dad was impressed with the room inside it.
Out of action for next 3 days.
Out of action for next 3 days.
August 27, 2006
Mayo
DOing the papers again, I was finshed at 8am, then straight over to the house, I had to finish off wiring the double socket.
When I had that done I decided to put in another double socket upstairs in the attic for the 8 way TV distribution box so that I can install the aerial and distribute the tv signal to the other rooms.
Signal when taken upstairs is fine but not great downstairs.
Off home at about 12pm, feeling crap but ready to watch the Mayo match,
When I had that done I decided to put in another double socket upstairs in the attic for the 8 way TV distribution box so that I can install the aerial and distribute the tv signal to the other rooms.
Signal when taken upstairs is fine but not great downstairs.
Off home at about 12pm, feeling crap but ready to watch the Mayo match,
August 26, 2006
Wiring, painting etc
Stumbled into the house about 9, cleaned out the front bedroom so that the skirting can get its final coat of varnish. Also had to pain around the painter cawk on the landing to blend it in with the wall.
Aidan can again to finish and test the alarm. I had to wired in a double socket for Eircom to install the dish for the phone.
It needs a power supply beside the phone lines so I had to wire into the back of an exisitng double socket. I had to run upstairs then to run CAT5 cable from the power point to the gable where the dish will be.
I also had a match so dad came over and we set out 4" solids on each of the corners where the container will be. The container is 8ft by 20ft.
Off to the match, I was not feeling the best before it, lacking energy but played anyway.
Aidan can again to finish and test the alarm. I had to wired in a double socket for Eircom to install the dish for the phone.
It needs a power supply beside the phone lines so I had to wire into the back of an exisitng double socket. I had to run upstairs then to run CAT5 cable from the power point to the gable where the dish will be.
I also had a match so dad came over and we set out 4" solids on each of the corners where the container will be. The container is 8ft by 20ft.
Off to the match, I was not feeling the best before it, lacking energy but played anyway.
August 25, 2006
A shed nearly there
Had to head out to Gerry in McHales to pay him the rest for the 20ft container. It will be delivered on Monday next.
Siobhan was here again, we wanted to hang the curtains in our room to see they looked good. I finished the flooring in the room upstairs.
We then decided to start cleaning up the saw room, must have been a bag of saw dust! Also a lot of waste timber, so I cut this up on the saw and we moved all boxes of firewood into the spare bedroom upstairs,
The dust was killing herself and we headed off at 10pm, I have work to do for Stevie on the system I am helping him develop.
Siobhan was here again, we wanted to hang the curtains in our room to see they looked good. I finished the flooring in the room upstairs.
We then decided to start cleaning up the saw room, must have been a bag of saw dust! Also a lot of waste timber, so I cut this up on the saw and we moved all boxes of firewood into the spare bedroom upstairs,
The dust was killing herself and we headed off at 10pm, I have work to do for Stevie on the system I am helping him develop.
August 24, 2006
Cleaning the floors
Dad was over, he cleaned up all floors of the room upstairs and took down the skirting. It is great that we are also getting this room cleared and floored.
Once all the flooring has been done the saw can be taken down from the "saw room" and Siobhan can have it back as a bedroom.
I started flooring the room and due to 2 V shaped angles in the room it was akward but managed to get 1/2 of the room done. Aidan was also here to put the alarm working but mainly to test all the PIRs.
Once all the flooring has been done the saw can be taken down from the "saw room" and Siobhan can have it back as a bedroom.
I started flooring the room and due to 2 V shaped angles in the room it was akward but managed to get 1/2 of the room done. Aidan was also here to put the alarm working but mainly to test all the PIRs.
August 23, 2006
Move them tools
The tools and that upstairs all needed to be moved down, very slow job but with Siobhans help they are all gone down, I put some of the sheets of ply up in the attic.
August 22, 2006
Paths done!
Sean and the lads have all the paths in now, he also flattened out a big part of the lawn. I could not get into the house because of the fresh concrete. Off Home!!
August 21, 2006
Sean does well
Sean was there today, he has now cased in all the paths and rose it up around the house.
I had to go to McHales and pick out a container, 1800 cash which is a good price for a container which is in good condition,
Back to the house, the lads had buried the gas pipe from the house under the paths, had to try and dig it out!!
I had to go to McHales and pick out a container, 1800 cash which is a good price for a container which is in good condition,
Back to the house, the lads had buried the gas pipe from the house under the paths, had to try and dig it out!!
August 20, 2006
Build them blocks
Papers in late, so I did not manage to finish up until 9.30am, home for a quick breakfast and over to the house, Gerry arrived out and we got stuck into moving the large pile of timber,
It tooks us a good 2 hours to move it all, the back to the othe gable to move all the scaffolding and boards, again another hour but that was that!!
There is just 2 piles of slates to move now with the straps and the digger.
We also built up some of the blocks into a neat pile,
It tooks us a good 2 hours to move it all, the back to the othe gable to move all the scaffolding and boards, again another hour but that was that!!
There is just 2 piles of slates to move now with the straps and the digger.
We also built up some of the blocks into a neat pile,
August 19, 2006
DOn't fret!
Over about 8, Job is to final coat the pres and stain the worktop, again a load of small jobs to do. Sean called and is going to level some of the site so that I can order the container.
This meant panic stations as he wants to start the paths on Monday.
With a truck load of blocks, slates, timber, scaffolding up against the house it all needs to be moved. The table and chairs and the tumble dryer both arrived today.
Had to head into town to get the large 22" grate and fret, had to made in Dineens and ordered through Heiton Buckleys. But feck me the one they make is 26" Have to go back with it.
GOt back to the house and started to move stuff out of the bedroom/tool room up stair stairs so that it can be put int he container and I can floor that room also.
Liam started the leveling about 4pm, Dad came over to give me a hand, but with me having a match @6pm it was going to leave it tight.
Liam gave us a hand with the bucket to shift about 250 blocks in 20 minutes, but that is the main thing to move.
Dad stayed on and moved the timber and other stuff.
I am working @5am in the morning so will have to head over after that to move the rest of the stuff, will be slow but it has to be done. All going well there will be a big change outside next weeked.
It is really dragging on but I think I can see light at the end of the tunnel!!!
This meant panic stations as he wants to start the paths on Monday.
With a truck load of blocks, slates, timber, scaffolding up against the house it all needs to be moved. The table and chairs and the tumble dryer both arrived today.
Had to head into town to get the large 22" grate and fret, had to made in Dineens and ordered through Heiton Buckleys. But feck me the one they make is 26" Have to go back with it.
GOt back to the house and started to move stuff out of the bedroom/tool room up stair stairs so that it can be put int he container and I can floor that room also.
Liam started the leveling about 4pm, Dad came over to give me a hand, but with me having a match @6pm it was going to leave it tight.
Liam gave us a hand with the bucket to shift about 250 blocks in 20 minutes, but that is the main thing to move.
Dad stayed on and moved the timber and other stuff.
I am working @5am in the morning so will have to head over after that to move the rest of the stuff, will be slow but it has to be done. All going well there will be a big change outside next weeked.
It is really dragging on but I think I can see light at the end of the tunnel!!!
August 18, 2006
Nice unit
Dad had made a cupboard unit with the IROKO worktop for the utility so this means that it is all kitted out, looks really well.
I had to undercoat the unit and stain the worktop, headed off home about 9.
I had to undercoat the unit and stain the worktop, headed off home about 9.