I had a phyysio session first off so I did not get to the house until 8, I wanted to get the other 2 angles done and get 5 boards into the hall, the floor was a bit off so it made it harder to get the boards together.
I manged to get what I wanted to do done so that was great.In the morning I went to Precison Engineering and gave them the measurements for the splashback and the frame around the glass blocks.Eircom rang me and they have decided that they will now put a pole on our site, 500 euro saved!!
A diary of our self build In Co. Mayo Ireland. Blog. Covering all aspects of building your own house. Timber frame house, insulation, underfloor heating, geothermal, tiling, timber floors, doors, varnish, painting and slogging it out!!!!
May 31, 2006
May 30, 2006
tough going
Had an hour & half of training and then back to the house, aim was to get that bedroom completed and get 2 of the four serious angles cut in. I used a template of underlay and cut it into place with a blade until it was perfect fit.
The jam of the door is one angle, the wall in the room is another angle and the wall in the hall was the opposite angle!!With me 2 boards into the halll I was happy out, packed it up at 11.30 again
The jam of the door is one angle, the wall in the room is another angle and the wall in the hall was the opposite angle!!With me 2 boards into the halll I was happy out, packed it up at 11.30 again
May 29, 2006
Ongoing
Dad was over, he finshed the timber around the waste pipe in the bathroom and started the skirting.I got another 5 lines done
Working away
I got stuck into the other bedroom and I managed to get 3/4 of it done, great job, faster than I expected.Headed off at about 11.30pm
May 28, 2006
May 27, 2006
May 26, 2006
Physio on the legs
Had to go to physio, have a repeatitive groin injury. I got back to the house and decided to finish that floor and start the other bedoom up stairs.Dad over the last 2 days had cleared up the 2 remaining rooms which was great, it took a lot of work.I got only 5 rows down but it is a good start.
May 25, 2006
Timbereer
Had trainign for 1 hour so I got to the house at 8pm. Managed to get 7 lines of the flooring done, these late nites are paying off!! So I am down to 1 board to finish the flooring in the room!!
May 23, 2006
CAncelled training
due to mental weather training was cancelled.So I got back to the flooring. Managed to get another 3 lines done.
May 22, 2006
Flooring our bedroom
Decision was made to start the flooring in the main bedroom upstairs. Took me 3/4 of a hour to set out the room to ensure the cuts would be ok.
With a dormer and chimney breast in the room it was going to be difficult.I managed to get only 3 lines done!! Had to take skirting down around the areas which I had to floor, then lay down the underlay.
With a dormer and chimney breast in the room it was going to be difficult.I managed to get only 3 lines done!! Had to take skirting down around the areas which I had to floor, then lay down the underlay.
May 21, 2006
Social schedule
Match and birthday party today so I on;y had a few hours in the morning. Plan was to get the tiles replaced on the front of the bath and also fill any holes around the stairs. wall etc.
May 19, 2006
Rip Of Ireland
Siobhan and myself got stuck into the painting of the back bedroom. Managed to get a coat on all walls.Problem with the pressure pump in the house, have to get the plumber back.Rang MayoCOCO, just for PERMISSION to dig the road we are charged 500 euro!! This bleeding country is a joke. We have already paid Government contribution and then have to repay!!
May 18, 2006
Cover the road!!
Dad was over to do all the trimmings around the stairs. looks well now.I gave the bathroom its 2nd coat.Rang MayoCOCO about getting a road crossing permit to cut the road for the eircom connection. Meant to ring me back.!
Painting
Over about 8am. Decided it was time to paint the hall. It took me the whole day with different cut ins around 5 doors etc. Siobhan was over and she gave the back room a 2nd coat.Dad continued with the boards on the back of the stairs.
May 17, 2006
Champions League
Champions league final so had to set up the TV in front of me. I decided it was time to give the main bathroom upstairs its first coat of final color. Took me the night to finish it.
May 16, 2006
Leaky
Meant to be training but 2 days of wedding activity took its tollThe plumbers were there yesterday and today. Disaster when the water was turned on, a leak under the jet bath which was now enclosed in a timber frame and tiled!! So they had to smash out the tiles!! Not impressed, a nut was not tightended!!!
May 14, 2006
May 13, 2006
slow day
Had a bit of shopping to do, got the stainless steel from Murphy stainless, 1.4m long by 140 mm high, 50 euro will cover it.
Had to go to heiton buckleys to get some stuff, while there I spotted they had steel frets, but only in 18" and we need a 21" so I said I would get it to see if it would do the job! It didn't!
Then onto FloorWorld to get a roll of the Underfloor specific underlay. 120 euro a roll which is costly.
Then out to Hursts to change the taps and basin. Back into CT electric to see if I could get lights to recess into the stairs, a bit of a shock @ 40 euro each!!
Off back to the house and got stuck into the front door and frame to stain it. Bleeding slow job, took me 4 hours to give it all 2 good coats!!!!
Also measured up the stairs for ceiling boards and trims,
Off home, Larrys wedding tomorrow so have to get the nails done!! :)
Had to go to heiton buckleys to get some stuff, while there I spotted they had steel frets, but only in 18" and we need a 21" so I said I would get it to see if it would do the job! It didn't!
Then onto FloorWorld to get a roll of the Underfloor specific underlay. 120 euro a roll which is costly.
Then out to Hursts to change the taps and basin. Back into CT electric to see if I could get lights to recess into the stairs, a bit of a shock @ 40 euro each!!
Off back to the house and got stuck into the front door and frame to stain it. Bleeding slow job, took me 4 hours to give it all 2 good coats!!!!
Also measured up the stairs for ceiling boards and trims,
Off home, Larrys wedding tomorrow so have to get the nails done!! :)
May 12, 2006
Stairs, plumber = Progress
Meet Declan at 8.30am, paid him his money, he will be finished today. Great to get that job done, really makes it feel like a house now!No sign of plumbers still, meant to have arrived Tuesday so I rang to "encourage" him to come and shock horror they were out there!!Went and got more paint and stain for the front door in Albany.We need to get a frosted laminate for the window in our room so it is not staring down on our neighbours. Checked on line and it was 50 euro for a small bit!! Rip offGot to the house and the plumbers had a nice bit done, heat was killing them!! There was an issue with one handbasin and set of taps so they have to go back, job for the morning! I had a match so I headed early.
May 11, 2006
Stairs near done
Training cancelled tonite so no training. I headed to the house and Declan and Dad were there doing the stairs. I cleaned up a bit after them and did the first coat of the final coat in the back bedroom.3 walls of it done now,