January 31, 2006
Doctors Visit
Off to the doc, throat and cough is no better and with training starting I need to get back to health
January 30, 2006
Water in the house
I rang Peter to get his lads to plum up the mains water. He did it so that meant we had water in the sinks, another mile stone!
I did not wait long, I took measurements off all the windows and went online for the prices.
I decided to take down all the glass blocks and get some advice.
I did not wait long, I took measurements off all the windows and went online for the prices.
I decided to take down all the glass blocks and get some advice.
January 29, 2006
Shaking Off The Flu
I got up this morning and headed off about 10am, it was badly cold. I inteneded to finish the glass blocks but when I discovered that the mortar had not dried and did not look like it would I decided against it.
So I then decided to starting sanding around window, doors, ceilings etc etc, pain of a job but it has to be done.
Siobhan was over and did a bit of painting, her mam & 2 sisters came for a guided tour so 3pm was not coming along too long.
So I then decided to starting sanding around window, doors, ceilings etc etc, pain of a job but it has to be done.
Siobhan was over and did a bit of painting, her mam & 2 sisters came for a guided tour so 3pm was not coming along too long.
January 28, 2006
Busy Day
Feeling a bit tired today, was home for 4am from Galway Dog races, great nite.
We went to Skye furniture first to get the bed and chest of drawers in the sale, 15% off.
Got to the house for 12, great sunny day. Intend to get the glass blocks built today, but I had 3 visitors which between them all took up near 2.5 hours!
Mick was over for a look at the house but as he said himself the details are on the blog so that is handy. That site for the LCD tv is www.Katronics.de
I had another Mick from across the road over and then Vinny and young Adam came over for a look. Siobhan got some tiles and testers for the kitchen. we had a few sarnies before we tried some tiles, it is hard to match up the kitchen, worktop, walls and black windows, still a great headache!
Actually for Marks sake I who said I put up the wrong name, meet him at the wedding last weekend and then again last nite in Galway, his name is Mark Jackson and he did or timber frame kit erecting!! Sorry Mark!!
I managed to get started on the glass blocks but it is a pain in the arse, had to leave each block lenght ways and width ways and then point between them, only managed 12 blocks, I know useless!!
So tomorrow I might get more done.!!
Plumber has all the house plumbed up for the water but has not connected it outside!!
Spark will be back Monday to finish off.
Geo Brian rang me and said that there was an issue with the pump but he will be back Tuesday.
It is funny now with the lights on in the house, you forget, so long used to having a lead and bulb that I forgot I had lights outside and in!!
Also the door bell works! It is a great buzz when you get to this stage.
We went to Skye furniture first to get the bed and chest of drawers in the sale, 15% off.
Got to the house for 12, great sunny day. Intend to get the glass blocks built today, but I had 3 visitors which between them all took up near 2.5 hours!
Mick was over for a look at the house but as he said himself the details are on the blog so that is handy. That site for the LCD tv is www.Katronics.de
I had another Mick from across the road over and then Vinny and young Adam came over for a look. Siobhan got some tiles and testers for the kitchen. we had a few sarnies before we tried some tiles, it is hard to match up the kitchen, worktop, walls and black windows, still a great headache!
Actually for Marks sake I who said I put up the wrong name, meet him at the wedding last weekend and then again last nite in Galway, his name is Mark Jackson and he did or timber frame kit erecting!! Sorry Mark!!
I managed to get started on the glass blocks but it is a pain in the arse, had to leave each block lenght ways and width ways and then point between them, only managed 12 blocks, I know useless!!
So tomorrow I might get more done.!!
Plumber has all the house plumbed up for the water but has not connected it outside!!
Spark will be back Monday to finish off.
Geo Brian rang me and said that there was an issue with the pump but he will be back Tuesday.
It is funny now with the lights on in the house, you forget, so long used to having a lead and bulb that I forgot I had lights outside and in!!
Also the door bell works! It is a great buzz when you get to this stage.
January 27, 2006
Just Gone To The Dogs!!
Off to the dogs in Galway with the lads of Celtic B team, excellent nite, there was no house as you can imagine!
Brian was there alright and has a good bit done now. Plumber was there also
Brian was there alright and has a good bit done now. Plumber was there also
January 25, 2006
United On Box
Plumber turned up today, thank fup, not going to be ready for tomorrow, but they will be ready soon enought.
Brian was there working
Nick called over for a look at the house, changed a bit since he was last here!
United on the old TV so off to look at it!!
Brian was there working
Nick called over for a look at the house, changed a bit since he was last here!
United on the old TV so off to look at it!!
January 24, 2006
Paper Boy
I was doing papers this morning with Dad. I then went to Hursts to get the 40 glass blocks and 2 bags of adhesive, one burst in the boot!
Dad rang me, he was talking to Sean and he asked if we could move the 3 bales of blocks away from the front to allow him get in with the machine.
I got to the house and took in the glass blocks. Siobhan arrived for a while to do some cleaning up and to admire the kitchen ;)
I managed to get the 132 blocks moved out of the way.
Did sweet feck all after that.
Dad rang me, he was talking to Sean and he asked if we could move the 3 bales of blocks away from the front to allow him get in with the machine.
I got to the house and took in the glass blocks. Siobhan arrived for a while to do some cleaning up and to admire the kitchen ;)
I managed to get the 132 blocks moved out of the way.
Did sweet feck all after that.
January 23, 2006
Filling The Site
Sean rang me today, he has got his hands on a few loads of fill for our site. Great job, will help to rise the site.
I got tot he house to clean up the kitchen, Brian and John were there 2nd fixing the electric, manged to get our first lights on, great buzz.
I got tot he house to clean up the kitchen, Brian and John were there 2nd fixing the electric, manged to get our first lights on, great buzz.
January 22, 2006
January 21, 2006
Wedding Day Off
At a wedding today, sparks meant to be there in house today to wire up and switch on the power.
January 20, 2006
Kitchen nears completion
Paul was there today to finish the kitchen but due to his motor breaking down he did not arrive until late and did not manage to finish it.,
I eventually got Siobhan out to the house and suprised her with the new kitchen.
A few pics of the kitchen, needs to be cleaned up and 2 doors are missing either side of the window.




I eventually got Siobhan out to the house and suprised her with the new kitchen.
A few pics of the kitchen, needs to be cleaned up and 2 doors are missing either side of the window.




January 19, 2006
kitchen goes in
Got up this morning early to get the Gas hob over for Paul, I suspected John had been there plastering as I smelt smoke, but biggest give away was the key in the back door!!!
I rang Peter about getting the water hooked up so that Brian could setup the heat pump. I then rang Brian2 to see if we were ready for kick off next Thursday. seems we still are.
Rang Paul to see if he got to the house ok, he did so I let him away with it. He told me he needed the dishwasher on site so that meant a 32 mile round trip home to get the dishwasher, then back over again with it,.
I arrived back at 8pm, Paul was still there and I was very suprised with the work he had done, had all the floor and wall units done, pelmit done, work top finished, doors hung, all in 10 hours! Unreal but hey he is the pro!!
I must say it is money well spent.
Spent a while talkin to a fellow boards and self builder Steven. Learned a bit more about air vents in our house, or lack of them!! My fault!
Brian the spark was still sick but intends to set us up on Saturday.
The next 2 weeks are vital, it could mean we have water, electric and heat in the house. Time will tell!
John had the wall plastered too so we wait 2 weeks, paint it and then put up the stairs, even though i think it maybe longer as I want to totally tile all upstairs first.
I rang Peter about getting the water hooked up so that Brian could setup the heat pump. I then rang Brian2 to see if we were ready for kick off next Thursday. seems we still are.
Rang Paul to see if he got to the house ok, he did so I let him away with it. He told me he needed the dishwasher on site so that meant a 32 mile round trip home to get the dishwasher, then back over again with it,.
I arrived back at 8pm, Paul was still there and I was very suprised with the work he had done, had all the floor and wall units done, pelmit done, work top finished, doors hung, all in 10 hours! Unreal but hey he is the pro!!
I must say it is money well spent.
Spent a while talkin to a fellow boards and self builder Steven. Learned a bit more about air vents in our house, or lack of them!! My fault!
Brian the spark was still sick but intends to set us up on Saturday.
The next 2 weeks are vital, it could mean we have water, electric and heat in the house. Time will tell!
John had the wall plastered too so we wait 2 weeks, paint it and then put up the stairs, even though i think it maybe longer as I want to totally tile all upstairs first.
January 18, 2006
Getting kitchen to be installed
I contacted Regina In Alpha kitchens for a few numbers I managed to get a hold of Paul, rang him and he was free tomorrow, no price mentioned but I know it will cost us about 600 euro for the 3 days work.
So I have to get the plans to him for 9am.
I did not go near the house today as United were on the box and my dad is out and home so headed for the heat!
So I have to get the plans to him for 9am.
I did not go near the house today as United were on the box and my dad is out and home so headed for the heat!
January 17, 2006
Paint - Plaster, Flu, kitchen!
Thomas rang me today, kitchen doors are ready and he reckons it will cost me 700 euro to get the kitchen installed. Now anticipated but I think I need to get it done.
Got a hold of John, he will be over this evening to check what has to be done.
Heat pump not due now until Thursday week.
Regina and Tommy arrived about 7 with the doors, one was damaged so they took it back. Doors look nice.
John called over about 8, was in the middle of painting, went through what had to be done, he hopes to tackle it before weekend.
I painted the 2nd coat of the main bedroom upstairs, a bit of touching up to do around edges, ceiling and sockets.
Headed off about 10, totally fupped now with this flu, might have to pay a visit to the doc.
Got a hold of John, he will be over this evening to check what has to be done.
Heat pump not due now until Thursday week.
Regina and Tommy arrived about 7 with the doors, one was damaged so they took it back. Doors look nice.
John called over about 8, was in the middle of painting, went through what had to be done, he hopes to tackle it before weekend.
I painted the 2nd coat of the main bedroom upstairs, a bit of touching up to do around edges, ceiling and sockets.
Headed off about 10, totally fupped now with this flu, might have to pay a visit to the doc.
January 16, 2006
Slowly Moving!
Arrived in at about 7, decided that I would seal the porcelain flooring, this is a tin of sealer which is applied with a cloth.
I am now seriously considering getting Thomas to install the kitchen, without dads help I will not be able to do it on my own.
Tried ringing John to get him to plaster inside the door but no dice.
Moved up to the front bedroom upstairs and painted the 2nd coat of the final coat. Want to start ticking off each room as regards painting now.
I am now seriously considering getting Thomas to install the kitchen, without dads help I will not be able to do it on my own.
Tried ringing John to get him to plaster inside the door but no dice.
Moved up to the front bedroom upstairs and painted the 2nd coat of the final coat. Want to start ticking off each room as regards painting now.
January 15, 2006
Short and sweet
Still freezing but sin e! , I was working at 5am this mornin, doing the papers for my dad, got absolutely drown wet but managed to wrap it up fairly rapid and got back into bed at 8am.
Did not raise my head until 12! Headed over and put up the plasterboard around the door. Said I would try and sand down the recess light holes. Then it was time for a clean up in the hall, brutal after all the sanding, planing etc.
I headed off again at 4.30, a big indian feed to look forward too!!
Did not raise my head until 12! Headed over and put up the plasterboard around the door. Said I would try and sand down the recess light holes. Then it was time for a clean up in the hall, brutal after all the sanding, planing etc.
I headed off again at 4.30, a big indian feed to look forward too!!
January 14, 2006
Door goes in!
I headed over about 9.30am, bleeding cold again today, Brendan will be over about 12. I decided to cut in the front bedroom upstairs, had to sand around the sockets also.
I got the door area ready and cleared up for Brendan and we set at it when he came. We had to make sure the hinges were ok, which they were.
The door needed planing on the top of and side but it closed a dream. We then had to take some off the bottom so that it would close ok.
We then put down the draft excluder and the lock and keeper, all in all it took us 3 hours, way more work to it than I expected but when you are a carpenter he made it look much easier!
There is 4 glass panels in the timber door frame, I do not yet have the double glazed glass so I had to cut out 4 panels of timber to pin them.
I have to cut out the plaseter board for it and put it up around the door and it will be ready for skimming, excellent, have to get onto John now.
I got the door area ready and cleared up for Brendan and we set at it when he came. We had to make sure the hinges were ok, which they were.
The door needed planing on the top of and side but it closed a dream. We then had to take some off the bottom so that it would close ok.
We then put down the draft excluder and the lock and keeper, all in all it took us 3 hours, way more work to it than I expected but when you are a carpenter he made it look much easier!
There is 4 glass panels in the timber door frame, I do not yet have the double glazed glass so I had to cut out 4 panels of timber to pin them.
I have to cut out the plaseter board for it and put it up around the door and it will be ready for skimming, excellent, have to get onto John now.
January 13, 2006
Glass Walls
Not much done today with the house, I arrived on site about 6pm, the door issue is still bugging me, wheather or not to hang it myself or not, with Dad out for what now could be up to 5 weeks this really has messed things up, but I as long as he is ok and today op went well that is all that matters.
I had one glass block to put in, the reason I left one was to see how strong and solid the other were with this FIXIT adhesive. It was spot on.
I decided to pain the final coat in the back bedroom upstairs, Siobhan had the walls done but not the ceiling so I scooted around it with the roller and painted the ceiling and gave the walls their second coat.
During my work I had an idea about the door, a neighbour of ours had offered to do some work when I had fixed their PC one nite, so I rang him and he said he would be over in the morning.
Headed off about 9.30
I had one glass block to put in, the reason I left one was to see how strong and solid the other were with this FIXIT adhesive. It was spot on.
I decided to pain the final coat in the back bedroom upstairs, Siobhan had the walls done but not the ceiling so I scooted around it with the roller and painted the ceiling and gave the walls their second coat.
During my work I had an idea about the door, a neighbour of ours had offered to do some work when I had fixed their PC one nite, so I rang him and he said he would be over in the morning.
Headed off about 9.30
January 12, 2006
Back to the soccer
Meet shane at TileSavers at 9am, there was no one there but we waited and they arrived about 5 past.
I had all the measurements worked out for the new order, decided to go with a different tile for the ensuite now and use the London Marfil in the two bathrooms when they come in.
So i left in the order and Shane rang me later on, the order was going to be 300 euro more now as the border tiles were dearer so we left it. Have to wait for the other tiles
Decided to go back training tonite, soccer at 10pm on the Astro so I decided to head home and get some dinner into me.
I had all the measurements worked out for the new order, decided to go with a different tile for the ensuite now and use the London Marfil in the two bathrooms when they come in.
So i left in the order and Shane rang me later on, the order was going to be 300 euro more now as the border tiles were dearer so we left it. Have to wait for the other tiles
Decided to go back training tonite, soccer at 10pm on the Astro so I decided to head home and get some dinner into me.
January 11, 2006
Tiling Mess
I did not do much today, had to go out to Shane with the cheque for the tiles. When i arrived out Shane said that the order on that tile only would not be in for 3 weeks, great not!
Have to rethink what we will do.
Home to work out measurements and ideas again!
Have to rethink what we will do.
Home to work out measurements and ideas again!