Today the pressure was on, John was due in tomorrow so we really had to choice but to have completed the upstairs and all tools, slabs, timber, insulation and other stuff all downstairs!!
We pulled into the site at 8am, myself Damo and Adam. Around the windows, the walls of the walk in wardrobe, the walls of the main bathroom, a piece of the ceiling and a wall on the landing and the dividing wall in the ensuite/wardrobe and main bedroom, also the 2 windows in this bedroom , the velux on the landing and velux in the bathroom, so as you can imagine the blue arsed fly was employed all day!!!!
Dad arrived over about 11am and we were honestly no where near as far on as I had hoped, he set to on the vertical timbers to hold the glass blocks and then onto the dividing walls which did all the windows and the veluxs.
The 2 lads completed the wardrobe and moved to the bathroom. As has been the complete trend in this house EVERYTHING has taken twice the time to complete, I don't know why, maybe because this is a dormer you have so many angle pieces to cut.
I was beginning to wonder if the price of 3k euro was a good price, maybe not!!!
At about 8.30pm with 2 walls and about 10 pieces to be put in I began to panic, we still had at least 90 minutes of tidiying to complete, there was also the small factor of doing all 4 boxes in the ensuite and bathroom, these took at least 20 minutes each,
We ploughed, slogged, huffed and puffed and wore it all down, Siobhan arrived at about 9pm, and even though she knew the dust would drive her allergies mental she gladly set to cleaning up the large bits of rubbish and bagging these.
At about 11.30 we completed all slabbing and Siobhan brought Damo and Adam home while myself and dad completed any cleaning up that needed to be done, it took us to near on 1am before all had been cleaned up and moved, we sat for 15 minutes to get our breath and headed off home, a long long day, it was alright for me I had 6.5 hours sleep ahead, dad only had maybe 4.5 before he started work, not a situation I envisaged him to be in and definately did not want him in again!
A diary of our self build In Co. Mayo Ireland. Blog. Covering all aspects of building your own house. Timber frame house, insulation, underfloor heating, geothermal, tiling, timber floors, doors, varnish, painting and slogging it out!!!!
August 31, 2005
August 30, 2005
Slabbing Away - Pics Attached
Picked the lads up at 7.45, we started on the hall, again more recess lights (5), it took a while, then onto the sitting rooms, 9 recess and a bay window meant it took us 2.5 hours!!
We then moved to the bedroom, was a flier, rapped it in an hour, then onto the dining room, six recess and 1 main light and a bay window killed us, spent literally all day doing the ceilings!!
Lads headed off at 7, I waited and finished the ensuite, totally finished now, have to complete the upstairs tomorrow regardless. Left at 11pm,
My dad installed the noggings for the manifold, 21 inches above the FFL.


We then moved to the bedroom, was a flier, rapped it in an hour, then onto the dining room, six recess and 1 main light and a bay window killed us, spent literally all day doing the ceilings!!
Lads headed off at 7, I waited and finished the ensuite, totally finished now, have to complete the upstairs tomorrow regardless. Left at 11pm,
My dad installed the noggings for the manifold, 21 inches above the FFL.


August 29, 2005
Have to earn the bread to make the house!!
Had to go to work today, the project has to be continued and I need to get the others enough of work to do while I am off.
I rang John G, my plasterer. He wants to arrive on Wed, he can if he wants but he may have to wait a day or two.
Left Adam and Damien there at 8 and went to Heitons to get more nails and a saw.
I rang the guttering lads in North west, Eamon said he will come next Monday and clear off the whole house.
I also rang a lad about doing stone, he said he was off for 2 weeks and would come back to me then.
I arrived on site at 7ish, the lads were still there, dad was with them, they had the bathroom, utility and kitchen done, with 10 recess lights and socket for the hood there was a lot of cutting!!
I went upstairs and started to finish around the doors and bathroom on the landing, battery went in the screw gun which was a pain and then the bulb blew!
Headed home at 12.15am, buckled tired!
I rang John G, my plasterer. He wants to arrive on Wed, he can if he wants but he may have to wait a day or two.
Left Adam and Damien there at 8 and went to Heitons to get more nails and a saw.
I rang the guttering lads in North west, Eamon said he will come next Monday and clear off the whole house.
I also rang a lad about doing stone, he said he was off for 2 weeks and would come back to me then.
I arrived on site at 7ish, the lads were still there, dad was with them, they had the bathroom, utility and kitchen done, with 10 recess lights and socket for the hood there was a lot of cutting!!
I went upstairs and started to finish around the doors and bathroom on the landing, battery went in the screw gun which was a pain and then the bulb blew!
Headed home at 12.15am, buckled tired!
August 28, 2005
TV in the house!!
this feels like pre season traing, all day every day, my legs barely fell out of the bed and my body told me to stay there!! I picked up Adam at about 8am, he too is
feeling the strain but does not complain. We started to finish off the main bedroom, it took much longer than we expected, John arrived at 9am, totally unexpected buy really appreciated, great to have mates like him, he
set to on the sitting room wall and got the ply finished off and it slabbed.
He headed off at one pm to watch Kerry and COrk.
Dad arrived about 10, he got stuck into putting in the extra piece of studding to facilitate the glass blocks in the ensuite/bedroom.
we set ourselves the goal of getting all upstairs ceilings and diagonals. the akward spots!!!
Dad trotted off about 5pm, he is putting in savage hours and with him starting his own job at 5.30am each morning the days are long!
We completed all ceilings upstairs, delighted with progress. We both decided at 7.30pm that we had enough, great to get home early.
feeling the strain but does not complain. We started to finish off the main bedroom, it took much longer than we expected, John arrived at 9am, totally unexpected buy really appreciated, great to have mates like him, he
set to on the sitting room wall and got the ply finished off and it slabbed.
He headed off at one pm to watch Kerry and COrk.
Dad arrived about 10, he got stuck into putting in the extra piece of studding to facilitate the glass blocks in the ensuite/bedroom.
we set ourselves the goal of getting all upstairs ceilings and diagonals. the akward spots!!!
Dad trotted off about 5pm, he is putting in savage hours and with him starting his own job at 5.30am each morning the days are long!
We completed all ceilings upstairs, delighted with progress. We both decided at 7.30pm that we had enough, great to get home early.
August 27, 2005
Continue slabbing
Picked up Adam at 7.45am, we set to straight away on back bedroom to get the walls done, the angles in a dormer is some pain in the ass, drive you mad to be truthful, my dad and John were there and they completed the sheeting of ply onto the walls in the landing, now it was left to us to slab it, very difficult, so we set into it.
It took us up to 2 hours to get it done with setting up scaffoling and that, but now it is done, it makes the landing huge.
MYself and dad finished off the landing ceiling, great to get that done.
The lads headed off aboout six, I started again into the small cuts around the doors, at the top of walls, in other words the small bits one person can do!!
I got a nice bit done, place looks more like a house by the hour!
I rang around without any success for a carpenter to get the gable ends done.
I went across to my new neighbour, Mick to ask if there was someone he knew and he did alright, himself!!! So next Saturday he will do it all,, I will get him a Hilti gun to aid in putting up the lath for the beading.
I headed off at 11pm, about to keel over now!! Still have to get it done!!
It took us up to 2 hours to get it done with setting up scaffoling and that, but now it is done, it makes the landing huge.
MYself and dad finished off the landing ceiling, great to get that done.
The lads headed off aboout six, I started again into the small cuts around the doors, at the top of walls, in other words the small bits one person can do!!
I got a nice bit done, place looks more like a house by the hour!
I rang around without any success for a carpenter to get the gable ends done.
I went across to my new neighbour, Mick to ask if there was someone he knew and he did alright, himself!!! So next Saturday he will do it all,, I will get him a Hilti gun to aid in putting up the lath for the beading.
I headed off at 11pm, about to keel over now!! Still have to get it done!!
August 26, 2005
God said let there be light and there was
have to get a lot done, with both the work in IT and the work in the house and training, feck the football, has to wait!!
I got my dad to head to CT Electrice to cable to make up and extension lead to get power from Sean next door.
I rang the lad who is making our door, it was due this week, but to be honest I am not ready for it yet!!, rang him, he did not remember me or the door!! another headache, said to ring him at the beginning of next week!!
I Got stuck into the first bedroom and managed to get the walls completed, at least it is one room down, 17 "rooms" to go!!!! Moved onto the next bedoom, it will be an early start in the morning and it was after 11pm when I turned off the light in the house, but it surely taking shape, a big echo now in the room!
I got my dad to head to CT Electrice to cable to make up and extension lead to get power from Sean next door.
I rang the lad who is making our door, it was due this week, but to be honest I am not ready for it yet!!, rang him, he did not remember me or the door!! another headache, said to ring him at the beginning of next week!!
I Got stuck into the first bedroom and managed to get the walls completed, at least it is one room down, 17 "rooms" to go!!!! Moved onto the next bedoom, it will be an early start in the morning and it was after 11pm when I turned off the light in the house, but it surely taking shape, a big echo now in the room!
August 25, 2005
1st day of slabbing
got Adam for the day, a great help and a savage worker.
We started at 7.30am and got stuck into the slabbing, doing the roofs while dad and John worked on the walls.
Talk about a slow and very tough job, but after a lot of huffing and puffing we managed to get the ceilings in the 3 bedrooms and landing completed, the landing is really the hardest as you are on temporary scaffolding.
The lads headed off at 6pm and I waited until 9.30 and filled in the easier work.
The underfloor heating gear arrived today, did not get a chance to look at it.
Near the end of the day I was finishing off a bit of slabbing when my plasterer John arrived. I thought grand we can sort out a date to start, but just not yet!!
Little did I know, he has 6 house lined up to do so unless I wanted to wait until the end of Oct, then i had to be ready for Thursday!! I near had a heart attack
We have 240 sheet of 8ft * 4ft (the are actually shorter) plasterboard to put up, have 11 windows cills to install, have 6 gable boxes to make and a lath to run the whole lenght of the house and 3 gables and then get the guttering guys to install the strip for the soffit, also the downstairs needs the vapour barrier installed.
On top of all that we are MENTAL busy at work!!
God where to next, will I get it done. I don't want to lose the plasterer but if I cannot get 3 days off next week it will not be done.
Have to organise some lights for here, long hours ahead.
Got a quote for the stone mason, 6.5k euro cash, nearly dropped dead!!
We started at 7.30am and got stuck into the slabbing, doing the roofs while dad and John worked on the walls.
Talk about a slow and very tough job, but after a lot of huffing and puffing we managed to get the ceilings in the 3 bedrooms and landing completed, the landing is really the hardest as you are on temporary scaffolding.
The lads headed off at 6pm and I waited until 9.30 and filled in the easier work.
The underfloor heating gear arrived today, did not get a chance to look at it.
Near the end of the day I was finishing off a bit of slabbing when my plasterer John arrived. I thought grand we can sort out a date to start, but just not yet!!
Little did I know, he has 6 house lined up to do so unless I wanted to wait until the end of Oct, then i had to be ready for Thursday!! I near had a heart attack
We have 240 sheet of 8ft * 4ft (the are actually shorter) plasterboard to put up, have 11 windows cills to install, have 6 gable boxes to make and a lath to run the whole lenght of the house and 3 gables and then get the guttering guys to install the strip for the soffit, also the downstairs needs the vapour barrier installed.
On top of all that we are MENTAL busy at work!!
God where to next, will I get it done. I don't want to lose the plasterer but if I cannot get 3 days off next week it will not be done.
Have to organise some lights for here, long hours ahead.
Got a quote for the stone mason, 6.5k euro cash, nearly dropped dead!!
August 24, 2005
Upstairs is getting head wrecking
More plastic, another job that is taking more longer than expected!!!! The upstairs is a nightmare!!!
August 23, 2005
Plastic Walls
Dad got extra rolls of plastic, 500g but to be honest it seems very light, I should have got maybe a 750g. I manged to get the wardrobe and ensuite plasticed.
Another day of plastic!!
Another day of plastic!!
August 22, 2005
Loads of slabs
My dad and his mate John were on site today, the took in a total of 80 sheets of 8ft*4ft of plasterboard, some carry but it has to be done, 240 sheets of plasterboard delivered altogether.
Some of it got wet with little tears on the plastic but we lost about 3 sheets, not too bad!! the sheets are actually not 8*4, they are 240mm * 120mm, which does not suit the height of our ceilings!!
Some of it got wet with little tears on the plastic but we lost about 3 sheets, not too bad!! the sheets are actually not 8*4, they are 240mm * 120mm, which does not suit the height of our ceilings!!
August 21, 2005
Bit of progress!
Started at 7am, Began to plastic the bathroom.
I also put up the insulation on the living room walls and I put fibre glass in the whole of the ceiling space. I had to plastic 2 meters in from the external walls.
In order to "future proof" the house I decided to put in extra empty conjude and sockets in the walls near the TV in the living room. At least I can then drop cables down the conjude in the future.
I had to add in extra noggings into the living room wall at the stairs to carry the plywood.
I put in the extra box in the bathroom upstairs.
The book case in the wall in the main bedroom also had to be secured and insulated at the back.
We also ran out of plastic today, not sure why the quantities were got so wrong but will have to get some tomorrow.
I also put up the insulation on the living room walls and I put fibre glass in the whole of the ceiling space. I had to plastic 2 meters in from the external walls.
In order to "future proof" the house I decided to put in extra empty conjude and sockets in the walls near the TV in the living room. At least I can then drop cables down the conjude in the future.
I had to add in extra noggings into the living room wall at the stairs to carry the plywood.
I put in the extra box in the bathroom upstairs.
The book case in the wall in the main bedroom also had to be secured and insulated at the back.
We also ran out of plastic today, not sure why the quantities were got so wrong but will have to get some tomorrow.
August 20, 2005
Don't drink and build!!
Totally hangover day, not used to the drink, killed me until 3pm, was some struggle to move, this was a totally waste of a day!!!
Siobhan said she would give me a hand to put up some plastic on the walls, we managed to get 2 of the bedrooms done upstairs.
Stone masons were also meant to call today, no sign, shock horror!!
Siobhan said she would give me a hand to put up some plastic on the walls, we managed to get 2 of the bedrooms done upstairs.
Stone masons were also meant to call today, no sign, shock horror!!
August 19, 2005
Day off
Today was a day off for me, we had our annual soccer dinner so I went on the beer for the night, great to get the night off!
My dad was working alright, he insulated the internal walls of the dining room/
He also had to put up some strips of ply to strenghten the wall of the kitchen and also on the living room wall along the stairs to give it strenght. Still full sheets of ply to go on this wall at a later stage.
My dad was working alright, he insulated the internal walls of the dining room/
He also had to put up some strips of ply to strenghten the wall of the kitchen and also on the living room wall along the stairs to give it strenght. Still full sheets of ply to go on this wall at a later stage.
August 18, 2005
Insulation on Externals done
We completed the insulation of the external walls downstairs, at least there is light at the end of the tunnel!
Also there was a double socket, a network box and phone socket to be installed in the wall, the noggings for these site about 25mm back from the face of the studding. Nearly took the head off myself when the blade of the reciprocating saw snapped and went flying!
The walls between the kitchen and utility needed to be tied to the floor joists for the strenght, managed to get this done also.
Also there was a double socket, a network box and phone socket to be installed in the wall, the noggings for these site about 25mm back from the face of the studding. Nearly took the head off myself when the blade of the reciprocating saw snapped and went flying!
The walls between the kitchen and utility needed to be tied to the floor joists for the strenght, managed to get this done also.
August 17, 2005
August 16, 2005
Insulate downstairs
I decided to be lazy and leave the small jobs up stairs and rip into the insulation downstairs.
Easy as in you can use up a full roll of 150mm rockwool on 3 lenghts of stud space. I manged to get the external walls on the bedroom, toilet, utility and 1/2 of the kitchen done.
I also completed the 100mm insulation in the dividing wall between the sitting room and bedroom.
Getting dark very fast these days. Sean offered my a lead for light so I must take him up on it.
Rang 2 lads to come out and quote us on the stone frontage and fireplace.
Easy as in you can use up a full roll of 150mm rockwool on 3 lenghts of stud space. I manged to get the external walls on the bedroom, toilet, utility and 1/2 of the kitchen done.
I also completed the 100mm insulation in the dividing wall between the sitting room and bedroom.
Getting dark very fast these days. Sean offered my a lead for light so I must take him up on it.
Rang 2 lads to come out and quote us on the stone frontage and fireplace.
August 15, 2005
Hot house!
Arrived on site for 7.30am, and got stuck into putting the plastic in the hall roof.
I then installed the fibre glass for the hall and dining room and did the 100mm rockwool in the vertical walls.
My dad arrived over and once he had finished his bit of work we decided to tackle the ceiling space with the fibre glass.
We decided to cut all the fibre glass into the correct widths and lengths before I went up.
Cut up about 30 rolls altogether and up I headed.
The heat was a killer, slim fast plan my ar*e, get up into ceiling space for a hour!!! ;)
Took us most of the evening to complete this.
I headed off to Hursts heating and meet with Wes, I got the glass blocks for the dividing walls between the ensuite and bedroom. A fiver each.
Also got the quadrant 900mm shower tray and waste, 125 euro.
I also got the dry lining screws (35mm) for the Senco gun I got the loan of. They cost 22 euro per 1000. It is estimated to take up to 9000 screws to do ours.
I got the load of about 10k screws from my mate (32mm) which I will fill into catridges when I get time. But I want to use the 35mm on the ceiling slabs to give them extra strength.
Also picked up 2 good masks (3m brand) for 6 euro each as the ones we had were crap.
Decided to call it a day about about 7.30pm - Good progress
I then installed the fibre glass for the hall and dining room and did the 100mm rockwool in the vertical walls.
My dad arrived over and once he had finished his bit of work we decided to tackle the ceiling space with the fibre glass.
We decided to cut all the fibre glass into the correct widths and lengths before I went up.
Cut up about 30 rolls altogether and up I headed.
The heat was a killer, slim fast plan my ar*e, get up into ceiling space for a hour!!! ;)
Took us most of the evening to complete this.
I headed off to Hursts heating and meet with Wes, I got the glass blocks for the dividing walls between the ensuite and bedroom. A fiver each.
Also got the quadrant 900mm shower tray and waste, 125 euro.
I also got the dry lining screws (35mm) for the Senco gun I got the loan of. They cost 22 euro per 1000. It is estimated to take up to 9000 screws to do ours.
I got the load of about 10k screws from my mate (32mm) which I will fill into catridges when I get time. But I want to use the 35mm on the ceiling slabs to give them extra strength.
Also picked up 2 good masks (3m brand) for 6 euro each as the ones we had were crap.
Decided to call it a day about about 7.30pm - Good progress
August 14, 2005
Split day
Arrived on site for 7.30, we have a match at 2.30 so I had to leave for a while.
The last place to rigid board was the landing but I had to setup a scaffold of sorts with planks to get up to it.
Again a very slow task and it took me up to 1pm before I go it finished.
We won the match 5-2 which was good, no goals for me today though!! shame!!
Got back on site a little worse for wear and my enthusism low but knew I still had to plod along.
At least no more rigid board to be done!
I put the plastic up in the dining room, I also had to drill down holes in the dividing walls for the cables.
The plastic was akward as there are bay windows which angle out, you also have to put fibre glass in the space in front of the dormers and roof space as you cannot get access to here from upstairs.
Left at 7.30, badly sore!
The last place to rigid board was the landing but I had to setup a scaffold of sorts with planks to get up to it.
Again a very slow task and it took me up to 1pm before I go it finished.
We won the match 5-2 which was good, no goals for me today though!! shame!!
Got back on site a little worse for wear and my enthusism low but knew I still had to plod along.
At least no more rigid board to be done!
I put the plastic up in the dining room, I also had to drill down holes in the dividing walls for the cables.
The plastic was akward as there are bay windows which angle out, you also have to put fibre glass in the space in front of the dormers and roof space as you cannot get access to here from upstairs.
Left at 7.30, badly sore!
August 13, 2005
Good Progress
Today the pressure had to be stepped up and the intention was to try and get the upstairs completed! I wish!
I arrived on site for just after 7am, lovely day so easy to work in it, even though the temperature was not long rising!
I started to rip through the upstairs with the rigid board and completed the bedroom and landing before I got an SOS call from my da was running 2 hours late with his deliveries so I had to change my clothes and head off with him, was gone about 1.5 hrs.
Sean was there doing the bay windows when I arrived, it looks well now with the ridges on them.
The vapour barrier has to be also installed downstairs about 2m from the outside walls on the back and front.
I started this and got the back of the house done, a slow job again especially with recess light cables to be also cut out.
The barries is staples to the joists, I have a staple hammer and this makes life very easy.

Then you have to go upstairs and stuff 200mm fibre glass in the roof space behind the walls leaving room for air to get in at the eaves.
Again a cramped job! I managed to get the back completed.


My dad was there and he was tying up the loose ends of the rigid board and doing any strenghtening. His hip is still at him and I am not happy he is putting weight on it, only the landing to do with rigid board now.
When the fibre glass is installed you then have to install 100mm rockwoo the vertical wall space. Again this has to be stapled into position to avoid sagging in the future.

Headed off at 7pm after a long hot day, but things are going well now.
I arrived on site for just after 7am, lovely day so easy to work in it, even though the temperature was not long rising!
I started to rip through the upstairs with the rigid board and completed the bedroom and landing before I got an SOS call from my da was running 2 hours late with his deliveries so I had to change my clothes and head off with him, was gone about 1.5 hrs.
Sean was there doing the bay windows when I arrived, it looks well now with the ridges on them.
The vapour barrier has to be also installed downstairs about 2m from the outside walls on the back and front.
I started this and got the back of the house done, a slow job again especially with recess light cables to be also cut out.
The barries is staples to the joists, I have a staple hammer and this makes life very easy.

Then you have to go upstairs and stuff 200mm fibre glass in the roof space behind the walls leaving room for air to get in at the eaves.
Again a cramped job! I managed to get the back completed.


My dad was there and he was tying up the loose ends of the rigid board and doing any strenghtening. His hip is still at him and I am not happy he is putting weight on it, only the landing to do with rigid board now.
When the fibre glass is installed you then have to install 100mm rockwoo the vertical wall space. Again this has to be stapled into position to avoid sagging in the future.

Headed off at 7pm after a long hot day, but things are going well now.
August 12, 2005
More Rigid board
Subscribe to: