July 17, 2008

Another day of stones

After about 4 attempts today we managed to get the machine and rake another section of the site, the area is about 100ft long by about 30/50 ft wide at its widest.
Myself and Michael got stuck in and Dad arrived about 10.30am, fair play to him after doing the papers.
Gerry was due to arrive also but did not manage it due to drink commitments the previous, but he arrived at 2pm and that helped push on the job.
We actually got through it fairly fast, unfortunatley my cracked rib was killing me but had to bear it to get the work done.
So Michael or his Dad Sean raked with the machine and then we pulled back the small stones.
The lads had to go at 4pm and I managed to rid of Dad then also as I could see he was struggling and he had a days work done before he ever arrived.
So what was done today about 1/2 of what was orginally left. Sean called over about 7pm and we seeded what was done.
I then watered it and put up the "Bird protectors" :) Also known as strips of plastic on a stick!!!!
While I was outside I also measured up for the deck, after a year of promising the funds were there to do the work and I started to price around.
For 24 sqm of deck, I was getting quotes of about 1000 euro, thats for standard posts, spindles etc.
I was away with a friend of mine in Rome at a wedding and we got talking about what I was doing, he is is involved with timber processing and he needed me to do some website work for him so we "bartered" :)
Anyway, when he got back he got me a quote of 540!!!! I near died!
So when I heard that I decided to "grow the deck a little!! So now its gone to near 33 sqm.
Deck is 14ft wide, 24ft long and the creeps around the back of the house.
Dad and John are going to be involved again.
I tiled Johns daughters house as payback for all the work he did here.
I will throw up a few pics of it below.


Pretty poor pic of the lawn but you get the idea :)


Simple tiling here, but she liked the idea of the brick effect. Instead of individual borders we just cut large mosaic tiles into strips. Cheaper option


Just another different view.
This was one of 2 bathrooms and then 24 sq yards of kitchen floor.

May 10, 2008

Stone Picking the day away!!!!

I am sitting here and can barely stay awake, its been a long long day but I decided to end it with a nice can of cold draught Guiness :)

Started the morning working for my Dad at 5.30am, he delivered papers and for some reason the setup was poor this morning with papers and bundles missing so I was out until 9.45am, luckily my sister Marian was with me in her motor otherwise I would not have finished until 11am.

Georgeous morning, very sunny, so got a quick breakfast and was out and ready to start stone picking at 11am.
I bought a "Landscapers Rake" yesterday in NCF, its about 3ft wide with a long handle, also bought a fork, the two cost me 70 notes, so bit pricey. Also I enquired about the grass seed there and was told it was going to cost me 100 euro to cover the whole 3/4 acre.

The area I was to start with is 60ft by 20ft, roughly. I found that there was serious amount of stones, but I got stuck in and did my "molly Malone" and wheeled my wheel barrow etc.

Sean the next door neighbour and plant owner came over to investigate and suggested I get out a mini digger with rake.
He had one out so he got hold of it for me and with the rake buckets he started to tear into the area, I had at this stage probably 20 odd barrows of stone removed.
But once he got stuck in he took out in or about 30 mini digger buckets of "Skutch grass" and stones.
But it still needed to be covered by me also. So I also raked it for another 3 hours with him.

Then he came back with it and levelled it with the bucket of the digger. Again we took off another 5 buckets of stone, then he returned the machine.
To hire a machine like that is 140 euro but it costs 40 euro to transport!!!! Pricey for the day.

So I had to re-rake and re-level it again with my "super rake". I went in for a bit to eat at 6pm. Out again for 6.30pm and started the re-rake. Sean, fair play to him came out about 7.30pm again and between us spent another 1.5 hours raking and levelling.
I told him to head off home as we had 90% of it done and we also had the side section done, about 4ft wide by 40ft.
So at 9.30pm I finally finished so we are ready to seed this section. Considering that this section is 111 sq m , what remains is over 900 sq m then we are a LONG way off :)

I will try and take a pic of this tomorrow, that if I can walk. Working a 5.30am so I will be gimped!!!
Over and out

May 06, 2008

Kerbing,leveling and finishing

So once the lads had a done the wall I had to gather up all the timber and try and tidy up the site, it was a mess but still lacking shape and it was hard to motivate ourselves to get ready for seeding.


I had done a little research on hedges, tress etc and then decided it was time to try and get the hedging done, it was decided that Escolonia was a very good option. I borrowed Seans tracktor and started to shovel loads of soil into the transport box and make a 10" 2ft wide bank for the hedging all along the railway line, 92m to be precise, but once I had 18 loads done my dodgey groin was killing me, been out of soccer for 9 weeks now getting physio but with little joy, doing the basic work is now killing me so picking stones will be some challenge!! :)


Anyway, Sean approached me and told me that if I wanted to get the kerbing done that he could have a machine and men to me for the last week of April, they would also soil up the whole site and get outside the wall done with gravel and also the drive in the house with maintanence.

He said to also save me a lot of work he could get the machine driver to build bank 2 ft high and 3ft wide for me to hedge on, this was going to be great.


So they kept to their word and myself and Sean set out the kerbing on the Sunday for the lads to start on the Tuesday. They had all kerbing done in 2 days and then spent the next 4 days drawing soil and fill to to the site to try and level and soil the whole site. As you can see from the pictures below it made some changes.


The container was going to be a problem, it was planked right in the way of the work, so the decision was made to move it. Dad came over on the Bank Holiday Monday and we set up a base for it.

The Micheal used their 30 ton machine and chains and we moved it to its new home :) Nothing fell out of it!!!!

Then I spent the next couple of hours moving block, timber and other crap to the new site. It left a full run for the lads to fill it up. Luckily for me Sean donated about another 12 loads of soil, black bog soil to the back of the house. Hard to see it from the pictures but it is black!!!!


So I now have a gap of 70 ft odd to fill between the stone wall and the railway line. I did some pricing today.

Chain link, 70 euro for a 35m roll of wire.

12 concrete stakes, 10 euro each.


Then the other options was the panels, I have 9 panels already and 12 stakes. So I need to sit down and work out the budget :)


The plan now is also to price the decking, Siobhan would love a place to be able to sit and chat with our families, at the minute we have nothing so I will price that and again check our budget. Since January we have pumped about 12k into the site, a lot of money.


I have now to spend many days now working the rest of the site, about .7 acres!!!!! It will be fun!






View along the side of the house, all along this side is 92m!!! Side is in or about 30ft wide at the narrowest point.


Front of the site, with the kerbing down and panelsKerbing at front.
A good view of the panels



Images of the back of the house, container moved as you can see.


Picture from 1/2 way down the back. That on the right is a raised bank which I will plant hedging on.

Down the back, side panels also as you can see:




May 01, 2008

Its been a while

Been a quite few months to a year :) Cannot say we had done a lot with our patch but after much huff and puff we finally got ourselves back on track.

We started initially back in the middle of last year with a chat to girl called Paula Halpin in Westport re doing a landscape plan for us.
She sat us down asked what we wanted, we told her our thoughts and she came back a week later with a full drawn, taken off our CAD drawns outline drives, lawns, garden patches, hegding, flower beds, decking, paving, kerbing etc. Cost us 150 notes but to be honest it is well worth it as we have a goal now to aim for.

Back then at the beginning of the year I finally got Sean and his lads to come in and level the place off.
There was a load of fill to go in to pull up the back of the house to the near required level before soiling.
Over the next 3 weeks they left in 30 loads of fill to rise up the back and sides of the house.

Then the decision was also made to put a boundary between myself and Sean.
The options were hedge, fence, post and rail, blocks or concrete panels.

The panels in the end were the best and quickest option, with Seans lads able to do the lot of the work we would split the costs on the 50m run.
The panel are 6ft long and 1ft high, we used min of 4 and max of 5 panels high per run. Each panel cost 13 euro each ex vat and also 13 euro per each of the concrete posts which house the panels. The panels are stone effect on one side and plain on the other.
The work itself took about 8 days to do but it was an A1 job which really changed the whole face of the site.

Next up was the front wall. We have a run of 192ft from side to side along the front of the wall. Planning had it noted that we need to have 60ft of stone frontage. I weighed it up and decided that we would use up 125ft of the side with stone faced wall.
I got Sean to put the foundations in and then we were going to block it ourselves, well we did until I was told that a lad would block the lot of it for 290 euro, which was spot on, working out about 70 cent per block.
This changed the whole frontage big time.

The next job was to find someone to do the stone. The original stone masons were no longer working so I had to search about. I got a lad who said he was a good stone mason, brought to work he did and sure enough it looked spot on. Put a price of 3900 euro on it.
So I told him to match the house, got him his bags of cement (4.35 per bag) and 10 ton of sand.
So I left him to it, was working late so it was difficult to see progress, that was until my next door neighbour asked me “Did you spot the stonework”, my answer was “Ya, it looks spot on” but when he asked me did I “really see it” I was worried.
So next day I headed out after lunch to see “the stone work”. I nearly collapsed, how should I put it, if you were to give the work to a 1 handed blind man then you may get better. So to summarise, I got shot of him and spent all one Saturday pulling the lot down with a sledge hammer. So it had to start again.

I got a number then of a lad who I gave UFH advice to for Lithuian lads, Mindy. He arrived with a portfolio of maybe 50 photos and had his tape and measured and priced. He quote me initially 4800 for the stone work and 5400 to also cap the wall.
After a little discussion we arrived at a price of 4500 to do the whole lot, including capping.
So I then got delivery of 45 bags of cement and I already had the sand. It would be 6 weeks before they were able to start.

Then one morning about 2 weeks later I got a call from Mindy to ask me if he could start tomorrow as he had been let down on the delivery of stone!!!!! I near had panic attack J I had no cement delivered and no pallets of stone, which I agreed with Mindy I would get.
So I rang Sweeneys down the Newport road to see if they could deliver and sure enough within 2 hours they had the cement landed. The lads had enough sand and stone to work away with.

So off they set. The worked from about 7am to 5pm most days, Saturdays and Sundays 1/2 days.
To watch these guys work was a joy to say the least, they would spend hours chipping and shaping, no angle grinders or con saws.
They lads were eating up the stone, I had intended to buy 2 pallets of stone at 150 euro per 2 ton pallet.
Mindy wanted 4 pallets! So I was looking at 600 spots for 8 ton of stone!

I rang www.LackenStone.ie and chatted to them there. They said they could deliver to me no bother but then asked me would I have any use for a full load? A full load is 20 tons at 950 euro cash so I decided that for 350 euro more I would get 12 ton, so no real decision. They delivered, made a drop at either side of the gate and the rest of the back.

The lads wrapped up the whole job in 2 weeks, 4 of them. The returned a week later, took down all the casing they used for the caps.
They also then proceed to chip away all waste mortar and clean down the whole wall with a mortar clearer!! Now that’s a service!!
Below is pictures I took during the site fill, the wall build and you can just spot the panels.














December 06, 2007

Trades & Contacts

Guys,
A few people have asked me about who I went with for different things.

Engineer:
Michael ConwayConway Survey & Design, Cashel, Ayle, Westport, Co.Mayo
Tel: 098-35931Fax: 098-35935Mobile: 086-3417478

Window:
Mahon Windows, Athlone, Westmeath

Timber Frame:
Clarke Homes, Lisnaskea, Fermanagh,

Ground works by Sean O'Malley, Cloggernagh, Islandeady, Castlebar, Co.Mayo

Underfloor heating from www.underfloordirect.co.uk

Geothermal from Climate contol in Tuam in Galway, contact Brian Cooley.

Appliances all from Ebay, SecondTek

November 28, 2007

Decking help

Got chatting to a lad who I emailed as regards decking and that.

Eoin is involed in landscaping, ground maintence and decking, with Eoins experience and guidance I was provided with details spec of the materials required, a few different ideas of designs and when I start into it will be available to me in case myself and my Dad get into bother.

I sent him off a few photos of the area to be decked and exact measurements and he gave me a bill of material and 2 designs. In fairness he did all this for 100 euro, saved me a packet.

Not to get the deck done!!!

Have a look at Eoins website www.garden-scapes.net

November 15, 2007

Garden finished, walls built, shed built

Wow, we have now everything completly finished and there is nothing to do :( NOT!!!!

Still no move, spent the last near 4 months chasing the neighbour to get the work done. So not a sausage done!!! I will continued with things once I get the man back!!


Appeared on RTE 1 on 9th December in a show Highly Recommended about all the goods I purchased online, it was great to be on the TV and I won the show pocketing me 2,000 euro!!

April 27, 2007

The task ahead

I decided to take a few pictures of the garden and what needs to be done!! It will be a big job but will have to be tackled in stages over the next 3 years or so!!!

But if anyone has any suggestions fire them on or any budding landscaper want to test their skills on a new site I am looking to get some layouts designed, will be doing the work myself but could do with the ideas!!




















Final Pictures - Upstairs

These pictures are of the upstairs : Probably the most uncomplete part of the house!!

Guest Bed 2 - If you have a good back!!!

Spare Bed 3 - aka GYM!!!

Main Bedroom :

Landing :


Landing Again :



Bathroom Upstairs :



Nice Jacuzzi Bath!!

Final Pictures - Downstairs

Sorry about the delay but I only got around to taking these this week.

Sun Room :

Main Bath DownStairs :

Another of the Main Bathroom :

Guest Bedroom downstairs :

Stairs :


Sitting Room :

Fireplace :

Hall Entrance :



Kitchen:

April 17, 2007

The break is over

Well as you can see it has been a while, my holiday is over!! ;)

Since I last posted we have moved in, the Friday before the All-Ireland to be precise, we have done little since, hanging pictures, mirrors etc/
Bought some furniture and I did a little cleaning up around the house but bar that not a lot has been done.

No issues as yet, geothermal has been a great success, I have to do another reading of the electric so that I can quantify the usage in the house, must get that done now soon.

We have started the process of planning the garden/lawn/site/dump what ever name you want to put on it!!!

We have also have had a gander at pricing for decking, so the decking and garden are the next projects.

The decking will have to be done first to allow the outside to be used as of yet we have no where to sit so that will be tackled in the next 2-3 months. Prices are ranging from 800-1400 for material only.

I must get some photos up now also as people have been wondering how we finished it.

Thanks to all for the comments, emails etc. Feel free to contact me, I will answer what I can.

September 11, 2006

back to grouting

Grouting to be finished in the kitchen and the white grout in the bathroom to be redone. Slow job but that is the last large job done.

back to grouting

Grouting to be finished in the kitchen and the white grout in the bathroom to be redone. Slow job but that is the last large job done.

back to grouting

Grouting to be finished in the kitchen and the white grout in the bathroom to be redone. Slow job but that is the last large job done.

September 10, 2006

2 matches in 1 day

Today was a late one, I had my first match at 12pm for the C team but the ref was late and we did not start until 20 past. So after a mad busy match we won 2-1.
The that finished at 2pm, I got my packet of Jaffa cakes and had 10 minutes of rest before I went out for the warm up again.
The B team game kicked off at 2.30pm and near the end I got cramp, but again we won this 1-0. So I could be he first to get 6 points in one day!!!
Back to the house and the final coats of the stairs!

September 09, 2006

Drill it

Over about 8am, I gave the stairs another coat and then into town to get the Core bit and drill from Sam Hire for 30 euro to drill through the wall for the tumble drier vernt.
Took about 1hour to get through the block but then I hit one of the studs in the wall so had to cut around this also.
Eventually got a 4" sewage pipe in for the vent.
Then had to drill a section out for the vent from the machine, pain in the head all this.
Took me near the whole day to finish this job.
Got another coat on the stairs and one coat on the back bedroom door.
Off home about 8pm.

September 04, 2006

Days of varnish

Started varnishing the spindsles again, slow job only 10 done! Gave the stairs another coat
Varnishing!!!!

5th - No training so finished off the remaining 15 spindles and gave a coat to the steps
6th - Varnish varnish varnish!!! cat slow but it has to be done
7th - varnish stairs after training
8th - Varnish stairs and saddles, finally getting there now with this, pulled ship at about 12.30am. Varnishing near the end at the weekend.

September 03, 2006

Skin sanding

Over for 7.30, sanding again, lose the skin on my fingers at this stage!! all sanding of the steps done bar 2.
Gave the done steps a coat of varnish, off to a match then

September 02, 2006

Sand, sand more sand

A day of sanding and sanding and more sanding!! From 7am to 8pm. I had a "mouse" sander so that was excellent for the steps.

September 01, 2006

Sanding

Started to sandt the spindles with over 50 and it taking 15 minutes each this is gone to be slow!!
Dad was over shelving