April 27, 2007

Final Pictures - Upstairs

These pictures are of the upstairs : Probably the most uncomplete part of the house!!

Guest Bed 2 - If you have a good back!!!

Spare Bed 3 - aka GYM!!!

Main Bedroom :

Landing :


Landing Again :



Bathroom Upstairs :



Nice Jacuzzi Bath!!

Final Pictures - Downstairs

Sorry about the delay but I only got around to taking these this week.

Sun Room :

Main Bath DownStairs :

Another of the Main Bathroom :

Guest Bedroom downstairs :

Stairs :


Sitting Room :

Fireplace :

Hall Entrance :



Kitchen:

April 17, 2007

The break is over

Well as you can see it has been a while, my holiday is over!! ;)

Since I last posted we have moved in, the Friday before the All-Ireland to be precise, we have done little since, hanging pictures, mirrors etc/
Bought some furniture and I did a little cleaning up around the house but bar that not a lot has been done.

No issues as yet, geothermal has been a great success, I have to do another reading of the electric so that I can quantify the usage in the house, must get that done now soon.

We have started the process of planning the garden/lawn/site/dump what ever name you want to put on it!!!

We have also have had a gander at pricing for decking, so the decking and garden are the next projects.

The decking will have to be done first to allow the outside to be used as of yet we have no where to sit so that will be tackled in the next 2-3 months. Prices are ranging from 800-1400 for material only.

I must get some photos up now also as people have been wondering how we finished it.

Thanks to all for the comments, emails etc. Feel free to contact me, I will answer what I can.

September 11, 2006

back to grouting

Grouting to be finished in the kitchen and the white grout in the bathroom to be redone. Slow job but that is the last large job done.

back to grouting

Grouting to be finished in the kitchen and the white grout in the bathroom to be redone. Slow job but that is the last large job done.

back to grouting

Grouting to be finished in the kitchen and the white grout in the bathroom to be redone. Slow job but that is the last large job done.

September 10, 2006

2 matches in 1 day

Today was a late one, I had my first match at 12pm for the C team but the ref was late and we did not start until 20 past. So after a mad busy match we won 2-1.
The that finished at 2pm, I got my packet of Jaffa cakes and had 10 minutes of rest before I went out for the warm up again.
The B team game kicked off at 2.30pm and near the end I got cramp, but again we won this 1-0. So I could be he first to get 6 points in one day!!!
Back to the house and the final coats of the stairs!

September 09, 2006

Drill it

Over about 8am, I gave the stairs another coat and then into town to get the Core bit and drill from Sam Hire for 30 euro to drill through the wall for the tumble drier vernt.
Took about 1hour to get through the block but then I hit one of the studs in the wall so had to cut around this also.
Eventually got a 4" sewage pipe in for the vent.
Then had to drill a section out for the vent from the machine, pain in the head all this.
Took me near the whole day to finish this job.
Got another coat on the stairs and one coat on the back bedroom door.
Off home about 8pm.

September 04, 2006

Days of varnish

Started varnishing the spindsles again, slow job only 10 done! Gave the stairs another coat
Varnishing!!!!

5th - No training so finished off the remaining 15 spindles and gave a coat to the steps
6th - Varnish varnish varnish!!! cat slow but it has to be done
7th - varnish stairs after training
8th - Varnish stairs and saddles, finally getting there now with this, pulled ship at about 12.30am. Varnishing near the end at the weekend.

September 03, 2006

Skin sanding

Over for 7.30, sanding again, lose the skin on my fingers at this stage!! all sanding of the steps done bar 2.
Gave the done steps a coat of varnish, off to a match then

September 02, 2006

Sand, sand more sand

A day of sanding and sanding and more sanding!! From 7am to 8pm. I had a "mouse" sander so that was excellent for the steps.

September 01, 2006

Sanding

Started to sandt the spindles with over 50 and it taking 15 minutes each this is gone to be slow!!
Dad was over shelving

August 28, 2006

Flu's out

I could not get out of bed today, the flu has hit me like a wall!! The container has arrived, Dad was impressed with the room inside it.

Out of action for next 3 days.

August 27, 2006

Mayo

DOing the papers again, I was finshed at 8am, then straight over to the house, I had to finish off wiring the double socket.
When I had that done I decided to put in another double socket upstairs in the attic for the 8 way TV distribution box so that I can install the aerial and distribute the tv signal to the other rooms.
Signal when taken upstairs is fine but not great downstairs.
Off home at about 12pm, feeling crap but ready to watch the Mayo match,

August 26, 2006

Wiring, painting etc

Stumbled into the house about 9, cleaned out the front bedroom so that the skirting can get its final coat of varnish. Also had to pain around the painter cawk on the landing to blend it in with the wall.
Aidan can again to finish and test the alarm. I had to wired in a double socket for Eircom to install the dish for the phone.
It needs a power supply beside the phone lines so I had to wire into the back of an exisitng double socket. I had to run upstairs then to run CAT5 cable from the power point to the gable where the dish will be.
I also had a match so dad came over and we set out 4" solids on each of the corners where the container will be. The container is 8ft by 20ft.
Off to the match, I was not feeling the best before it, lacking energy but played anyway.

August 25, 2006

A shed nearly there

Had to head out to Gerry in McHales to pay him the rest for the 20ft container. It will be delivered on Monday next.
Siobhan was here again, we wanted to hang the curtains in our room to see they looked good. I finished the flooring in the room upstairs.
We then decided to start cleaning up the saw room, must have been a bag of saw dust! Also a lot of waste timber, so I cut this up on the saw and we moved all boxes of firewood into the spare bedroom upstairs,
The dust was killing herself and we headed off at 10pm, I have work to do for Stevie on the system I am helping him develop.

August 24, 2006

Cleaning the floors

Dad was over, he cleaned up all floors of the room upstairs and took down the skirting. It is great that we are also getting this room cleared and floored.
Once all the flooring has been done the saw can be taken down from the "saw room" and Siobhan can have it back as a bedroom.
I started flooring the room and due to 2 V shaped angles in the room it was akward but managed to get 1/2 of the room done. Aidan was also here to put the alarm working but mainly to test all the PIRs.

August 23, 2006

Move them tools

The tools and that upstairs all needed to be moved down, very slow job but with Siobhans help they are all gone down, I put some of the sheets of ply up in the attic.

August 22, 2006

Paths done!

Sean and the lads have all the paths in now, he also flattened out a big part of the lawn. I could not get into the house because of the fresh concrete. Off Home!!

August 21, 2006

Sean does well

Sean was there today, he has now cased in all the paths and rose it up around the house.
I had to go to McHales and pick out a container, 1800 cash which is a good price for a container which is in good condition,
Back to the house, the lads had buried the gas pipe from the house under the paths, had to try and dig it out!!