August 09, 2006

Work holds me up

I was at work until 8.30. Dad was over to finish of some 2nd fixing and put skirting in the utility room.

August 08, 2006

Ward Robe on it's way

Another day another coat of varnish. Dad was over, he did great work in the walk-in wardrobe to add another shelve and clothes rail underneath.
He asked put up the skirting in the front room. Another great load of jobs done.
I continued on with my varnishing to 5 of the doors. I am of course giving the door 2 more coats than I intended but it leaves them clean, tough and like a mirror.
Was talking to Sean, he hopes to arrive next week to finish the ground work. Mick my engineer is due to arrive this week to sign off the house.

August 07, 2006

Dad & John working away

Monday - Match this morning but arrived over @ 8am. Opened all the windows to let the sunshine and fresh air in and then onto more varnishing! Had friends of the family over @10am to see he house
Then onto the match which we won 3-0.
Dad and John were over to do the door and frame for the utility room, then the walk-in wardrobe shelves. 2 great jobs done.
Myself and Siobhan assembled our bed and took all the wrappers off furniture.

August 06, 2006

Never ending

Over @ 9am. Again it was a day of varnishing, there was a match I went to and then back to more varnishing!! Have 7 doors given 4 coats and another 7 1 coat.
Back again tomorrow for more of the same!!

August 05, 2006

Varnishing to death!

Over about 8.30am, a day of varnishing ahead, doors, architraves and skirting, coat after coat after coat. Up to 4 coats on the doors downstairs.
Had to get the wardrobe railings, 4 4ft lenghts. Also I got paint to blend in the unit in the utility room, I gave Albany a piece of wood with the color of our kitchen,
the put in under a scanner and created the paint for me.
I had to go to a funeral so headed off early.

August 04, 2006

Varnish

Had to take out the TV to see if it worked, sure enough no bother!! Started then to varnish the doors, coat 3 to the dining room doors, bathroom and closet.
Coat 4 to sitting room door and coat 1 to the kitchen.
Headed off about 10

August 03, 2006

TV ready to watch!

Match today, TV arrived but did not get chance to look at it. Dad and John are making the units for the walkin wardrobe, had to get a load of timber.

August 02, 2006

Late but something done

Working late but manged to get a coat on the doors in the dining room and closet. It take 30 minutes per door.

August 01, 2006

Nothing Done

Training tonite and headed off home

July 31, 2006

TV near ready

LCD is ready, picked up today so time will tell if it is ok!
Dad was over and did the skirting in the hall. Also replaced the architrave upstairs.
More coats given to the sitting room door and dining room doors.

July 30, 2006

Varnish

Up at 7.15am, started to finish the final coats in the closet and ripped through that. Also wired up the aerial and boosters.Off to the match @ 10.30 and we beat the top team 5-2, there first defeat in 10,Back to the house and then started the touch up of paint in the dining room, slowly but surely it is getting there.Siobhan was over and she touched up the walls in the sun room while I varnished the doors in the dining room.Tasks down to 55!!!

July 29, 2006

Lots of jobs

Over at 7.30 to finish off the hood, the glass needed to be put on but the flutes who wrote the manual seemed to think that the actual extractor should be attached before the glass hood but no.So I had to take down the extractor and then put the glass up, took me 2 hours to change it all around!! I had to head to town and bought an aerial and booster set to see if can get any good pictures for the TV.

I also purchased some bulbs for the wall lights and put them in, poor design on the to be honest.Then it was onto varnishing the architraves, before I left I gave all the timber in the closet an undercoat ready to be finished in the morning.I had to head over to my mother in law to sand and varnish the front of bath for her, gave it 6 coats with a 20 minute drying interval, 2 coats at a time.Got home about 8.30 - also have match tomorrow for the C team, short on a keeper.

July 28, 2006

Dad was over and has made a great job in the closet, all the pipes, mainfold and pump are sheeted in and out of harms way.I have a list of about 70 odd jobs to do before the move in, varnishing dominates the list.


One job which had to be done was the Island hood/extractor fan.This was an unknown to me as I had thought I had bought this as a vented less extractor but soon discovered it was not.#I had to work out exactly how to put it up, then had to drill a hole for the vent hose, get into the active and feed it out to the soffit vents.
There is a need to fix a holder to the ceiling, fix the vent to it, then there are brackets which grip the hood and are screwed onto the holder. Once I had figured it out by 11.30pm I had it all up bar the glass hood which was at home.Busted tired, but great to get it out of the way.

July 27, 2006

No work

Match tonite and after complete domination we only drew, league is slipping away from us.Dad was over alright but I did not manage to see what he did.

July 26, 2006

Shelves again

I started the shelves in the closet, had to put in 2 shelves and a hanger for jackets. Siobhan was over and she has started cleaning the rooms. Bathroom cleaned nicely.

July 25, 2006

Training

Training tonite but I wanted to get the skirting in the front bedroom steel wooled and varnished.

July 24, 2006

LCD

I started to finish off the landing, had to finish off the cut in and then start the final full coat. Had to cut in the 2nd coat but at least it is another job out of the way!I transfer the 1400 euro to Techsplosion for the 40" LCD, a cracking price considering my mate paid 2200 here for the same screen!!

July 23, 2006

Shelves

Had anniversary mass for my gran today and out for a bit of lunch with the family so did not get near the house until 5pm.I decided to finish off shelving the hot press and put 2 sets of shelves in there, at least we can away the quilts!!

July 22, 2006

Time 2 say adios!

Up before 7am, over to the house and aim was to get any white grouting done. This was the splashback in the bathroom and also the tiles around the bath.The downstairs and grout the glass blocks for the last time, all of them had to be washed 3 times.Off into town to try and get some contact lenses but I found them very hard to insert and take out again, I have to go back to them again next week.

Got a few things in heiton buckleys then back to the house.I started to do the final cut in on the landing but Shane arrived and waited for over an hour so I then decided to start shelving the hot press.Headed off at 4pm as we were off to a Boceilli concert in Galway

July 21, 2006

Another room to finish paint

I was working late at work so only got to the house after 6. I decided to paint the ceiling and walls in the bedroom upstairs. This left only the skirting for doing in this room.Siobhan was over and she cleaned up our bedroom.We now have our bedroom, the sitting room, ensuite and bathroom upstairs fully finished. So ploughing along nicely.