A diary of our self build In Co. Mayo Ireland. Blog. Covering all aspects of building your own house. Timber frame house, insulation, underfloor heating, geothermal, tiling, timber floors, doors, varnish, painting and slogging it out!!!!
July 12, 2006
Basing it!
July 11, 2006
July 10, 2006
Nearing the end of flooring
July 09, 2006
Ceiling it
July 08, 2006
No show
A sore head on me today, bit too much wine out for dinner last nite, throw in a few Guinness and Red bull and it was a disaster.Up at 8am, got a breakfast sandwich and it took another hour for me to wake up,The rain had started but I needed to get out to move all the stuff from around the house for the lads to put in the footpaths.
Dad came over but since Sean had not apppeared with the digger it was akward to move.Sean arrived over and he told us that the ground was not high enough and that we would have to move back all the stuff!!We called it a day as we had to go to a birthday party.
RE COMMENT JULIE - Email me on aidangill@gmail.com and I can answer your questions.
July 07, 2006
Dinner time
July 06, 2006
July 05, 2006
July 04, 2006
Working late
July 03, 2006
Sick in the head!
He also bought in a load of timber to make shelves for the closet, hot press etc.I was at work until 8pm, mental busy and no time for anything, had a busting migraine also so had to head.
July 02, 2006
Matching it in the heat
Headed off to the match and drew in what seemed to be serious temperatures, was with the C team so I am not as pushed at winning the league with them as the B team.Back to the house and I decided to test drive the power showers!!!
I said since they were all cleaned up and hot water was there, what the hell!! Reminded me of a hotel shower with the power of it!Back to the boards and skirting, final coats and they are ready for Dad to tackle tomorrow.I decided it was time to also sand and varnish the skirting in the 2 bathrooms. Headed off at 7.30pm
July 01, 2006
Splashing about
June 30, 2006
?Nothing done!!
June 29, 2006
Match
June 28, 2006
Late @ work
June 27, 2006
Lights up
June 26, 2006
Still floored
June 25, 2006
Dismantlers in the heat
That took me 2 hours to do and pile up all the timber. All tanalised timbers so worth keeping.I moved into the hall again and worked away until 6pm. I have now left it with 3 lines to do.
June 24, 2006
Late nite, but no drink!
It took a good while to get the timber laid out and by then Brian had arrived to commission the Geothermal and sign off the system.Dad arrived over and we decided we would start and dismantle the timber panels at the side of the house, as they were in the way.
So with nail bar and hammers we got stuck into it and after 3 hours we had 2 of the panels done.Was 6 bells so Dad headed off and I moved inside to continue the timber. Also timbered into the closet so that was done also.There are 20 lines of timber to go down and I had 10 done by the time I left @ 10.30. A long day but the work is getting done.