But if anyone has any suggestions fire them on or any budding landscaper want to test their skills on a new site I am looking to get some layouts designed, will be doing the work myself but could do with the ideas!!
A diary of our self build In Co. Mayo Ireland. Blog. Covering all aspects of building your own house. Timber frame house, insulation, underfloor heating, geothermal, tiling, timber floors, doors, varnish, painting and slogging it out!!!!
April 27, 2007
The task ahead
But if anyone has any suggestions fire them on or any budding landscaper want to test their skills on a new site I am looking to get some layouts designed, will be doing the work myself but could do with the ideas!!
Final Pictures - Upstairs
Final Pictures - Downstairs
April 17, 2007
The break is over
Since I last posted we have moved in, the Friday before the All-Ireland to be precise, we have done little since, hanging pictures, mirrors etc/
Bought some furniture and I did a little cleaning up around the house but bar that not a lot has been done.
No issues as yet, geothermal has been a great success, I have to do another reading of the electric so that I can quantify the usage in the house, must get that done now soon.
We have started the process of planning the garden/lawn/site/dump what ever name you want to put on it!!!
We have also have had a gander at pricing for decking, so the decking and garden are the next projects.
The decking will have to be done first to allow the outside to be used as of yet we have no where to sit so that will be tackled in the next 2-3 months. Prices are ranging from 800-1400 for material only.
I must get some photos up now also as people have been wondering how we finished it.
Thanks to all for the comments, emails etc. Feel free to contact me, I will answer what I can.
September 11, 2006
back to grouting
back to grouting
back to grouting
September 10, 2006
2 matches in 1 day
The that finished at 2pm, I got my packet of Jaffa cakes and had 10 minutes of rest before I went out for the warm up again.
The B team game kicked off at 2.30pm and near the end I got cramp, but again we won this 1-0. So I could be he first to get 6 points in one day!!!
Back to the house and the final coats of the stairs!
September 09, 2006
Drill it
Took about 1hour to get through the block but then I hit one of the studs in the wall so had to cut around this also.
Eventually got a 4" sewage pipe in for the vent.
Then had to drill a section out for the vent from the machine, pain in the head all this.
Took me near the whole day to finish this job.
Got another coat on the stairs and one coat on the back bedroom door.
Off home about 8pm.
September 04, 2006
Days of varnish
Varnishing!!!!
5th - No training so finished off the remaining 15 spindles and gave a coat to the steps
6th - Varnish varnish varnish!!! cat slow but it has to be done
7th - varnish stairs after training
8th - Varnish stairs and saddles, finally getting there now with this, pulled ship at about 12.30am. Varnishing near the end at the weekend.
September 03, 2006
Skin sanding
Gave the done steps a coat of varnish, off to a match then
September 02, 2006
Sand, sand more sand
September 01, 2006
Sanding
Dad was over shelving
August 28, 2006
Flu's out
Out of action for next 3 days.
August 27, 2006
Mayo
When I had that done I decided to put in another double socket upstairs in the attic for the 8 way TV distribution box so that I can install the aerial and distribute the tv signal to the other rooms.
Signal when taken upstairs is fine but not great downstairs.
Off home at about 12pm, feeling crap but ready to watch the Mayo match,
August 26, 2006
Wiring, painting etc
Aidan can again to finish and test the alarm. I had to wired in a double socket for Eircom to install the dish for the phone.
It needs a power supply beside the phone lines so I had to wire into the back of an exisitng double socket. I had to run upstairs then to run CAT5 cable from the power point to the gable where the dish will be.
I also had a match so dad came over and we set out 4" solids on each of the corners where the container will be. The container is 8ft by 20ft.
Off to the match, I was not feeling the best before it, lacking energy but played anyway.
August 25, 2006
A shed nearly there
Siobhan was here again, we wanted to hang the curtains in our room to see they looked good. I finished the flooring in the room upstairs.
We then decided to start cleaning up the saw room, must have been a bag of saw dust! Also a lot of waste timber, so I cut this up on the saw and we moved all boxes of firewood into the spare bedroom upstairs,
The dust was killing herself and we headed off at 10pm, I have work to do for Stevie on the system I am helping him develop.
August 24, 2006
Cleaning the floors
Once all the flooring has been done the saw can be taken down from the "saw room" and Siobhan can have it back as a bedroom.
I started flooring the room and due to 2 V shaped angles in the room it was akward but managed to get 1/2 of the room done. Aidan was also here to put the alarm working but mainly to test all the PIRs.
August 23, 2006
Move them tools
August 22, 2006
Paths done!
August 21, 2006
Sean does well
I had to go to McHales and pick out a container, 1800 cash which is a good price for a container which is in good condition,
Back to the house, the lads had buried the gas pipe from the house under the paths, had to try and dig it out!!
August 20, 2006
Build them blocks
It tooks us a good 2 hours to move it all, the back to the othe gable to move all the scaffolding and boards, again another hour but that was that!!
There is just 2 piles of slates to move now with the straps and the digger.
We also built up some of the blocks into a neat pile,
August 19, 2006
DOn't fret!
This meant panic stations as he wants to start the paths on Monday.
With a truck load of blocks, slates, timber, scaffolding up against the house it all needs to be moved. The table and chairs and the tumble dryer both arrived today.
Had to head into town to get the large 22" grate and fret, had to made in Dineens and ordered through Heiton Buckleys. But feck me the one they make is 26" Have to go back with it.
GOt back to the house and started to move stuff out of the bedroom/tool room up stair stairs so that it can be put int he container and I can floor that room also.
Liam started the leveling about 4pm, Dad came over to give me a hand, but with me having a match @6pm it was going to leave it tight.
Liam gave us a hand with the bucket to shift about 250 blocks in 20 minutes, but that is the main thing to move.
Dad stayed on and moved the timber and other stuff.
I am working @5am in the morning so will have to head over after that to move the rest of the stuff, will be slow but it has to be done. All going well there will be a big change outside next weeked.
It is really dragging on but I think I can see light at the end of the tunnel!!!
August 18, 2006
Nice unit
I had to undercoat the unit and stain the worktop, headed off home about 9.
August 17, 2006
August 16, 2006
Work holds progress
Dad was over cleaning all the shee hit of the windows. So no sign of Sean, I will have to chase him up now.
August 15, 2006
Handle it nicely
A bag loads of small jobs.
August 14, 2006
Utility taking shape
Then gave the unit a coat of undercoat.
August 13, 2006
Mayo cancel work!
August 12, 2006
Bye bye rubbish
I needed to move all the bags to the gable, ended up there were 110 bags!! Could not belive it. I rang Burkes again and he said it would be more like 235 euro for the lot.
He then rang me back and said he could collect today.
I ran into town to get a mirror for the wardrobe, a 48" by 17" is 35 euro. Bit more expensive that I expected.
Back to the house and I gave an undercoat to the cupboards in the utility, slow job.
Burkes arrived and we loaded up 1.5 tons of rubbish, cost us 300 euro, more that I expected but it is gone now!
So back inside to watch the GAA, then back into give a first coat of the final color to the cupboards. AGain it took the guts of 2 hours.
Off at 8pm to give DAmien a life home.
August 11, 2006
Recylcing and cleaning
We decided that in order to allow us to recycle as much as we can we split up the shelves to hold 6 containers, for glass, paper, tins, etc etc.
This has now changed the whole utility room, now need to put in the rack for the washing machine and tumble dryer!!
Marie and Siobhan were there to clean up the bedroom and ensuite and try and get rid of the mounds of dust that has built up.
I finished the shelving in the cupboards and started to gather all cardboard together for the recylcing run.
I contacted Burkes bags to see if they would do a run to collect the bags of rubbish at the back of the house, about 40 bags. Said it would be about 150 euro.
I have to go and count them to see.
August 10, 2006
Road drilling
I have to talk to Sean as he had to co-ordinate with them;
Dad was over again and he was doing some shelving in the utility.
I got another coat on 5 more doors. so down now to about 5 doors to finish, with 2 of them up on 3 coats.
August 09, 2006
Work holds me up
August 08, 2006
Ward Robe on it's way
He asked put up the skirting in the front room. Another great load of jobs done.
I continued on with my varnishing to 5 of the doors. I am of course giving the door 2 more coats than I intended but it leaves them clean, tough and like a mirror.
Was talking to Sean, he hopes to arrive next week to finish the ground work. Mick my engineer is due to arrive this week to sign off the house.
August 07, 2006
Dad & John working away
Then onto the match which we won 3-0.
Dad and John were over to do the door and frame for the utility room, then the walk-in wardrobe shelves. 2 great jobs done.
Myself and Siobhan assembled our bed and took all the wrappers off furniture.
August 06, 2006
Never ending
Back again tomorrow for more of the same!!
August 05, 2006
Varnishing to death!
Had to get the wardrobe railings, 4 4ft lenghts. Also I got paint to blend in the unit in the utility room, I gave Albany a piece of wood with the color of our kitchen,
the put in under a scanner and created the paint for me.
I had to go to a funeral so headed off early.
August 04, 2006
Varnish
Coat 4 to sitting room door and coat 1 to the kitchen.
Headed off about 10
August 03, 2006
TV ready to watch!
August 02, 2006
Late but something done
August 01, 2006
July 31, 2006
TV near ready
Dad was over and did the skirting in the hall. Also replaced the architrave upstairs.
More coats given to the sitting room door and dining room doors.
July 30, 2006
Varnish
July 29, 2006
Lots of jobs
I also purchased some bulbs for the wall lights and put them in, poor design on the to be honest.Then it was onto varnishing the architraves, before I left I gave all the timber in the closet an undercoat ready to be finished in the morning.I had to head over to my mother in law to sand and varnish the front of bath for her, gave it 6 coats with a 20 minute drying interval, 2 coats at a time.Got home about 8.30 - also have match tomorrow for the C team, short on a keeper.
July 28, 2006
One job which had to be done was the Island hood/extractor fan.This was an unknown to me as I had thought I had bought this as a vented less extractor but soon discovered it was not.#I had to work out exactly how to put it up, then had to drill a hole for the vent hose, get into the active and feed it out to the soffit vents.
There is a need to fix a holder to the ceiling, fix the vent to it, then there are brackets which grip the hood and are screwed onto the holder. Once I had figured it out by 11.30pm I had it all up bar the glass hood which was at home.Busted tired, but great to get it out of the way.
July 27, 2006
No work
July 26, 2006
Shelves again
July 25, 2006
Training
July 24, 2006
LCD
July 23, 2006
Shelves
July 22, 2006
Time 2 say adios!
Got a few things in heiton buckleys then back to the house.I started to do the final cut in on the landing but Shane arrived and waited for over an hour so I then decided to start shelving the hot press.Headed off at 4pm as we were off to a Boceilli concert in Galway
July 21, 2006
Another room to finish paint
July 20, 2006
July 19, 2006
More varnish
July 18, 2006
Sand
July 17, 2006
Expensive glass
Off into get pin nails to put in the glass in the dining room doors. Had to pick up the 4 panes of glass from Lawless, 140 euro.Then back to the house but I had to leave again as it was hitting 28 degrees out the back and almost as much inside!! So back to help my da paint the school walls, time to top up Sunday "Tan"!!!
July 16, 2006
July 15, 2006
Bog and LCD
July 14, 2006
Could not handle heat, so off to bog!
July 13, 2006
Hard to work in mad heat
July 12, 2006
Basing it!
July 11, 2006
July 10, 2006
Nearing the end of flooring
July 09, 2006
Ceiling it
July 08, 2006
No show
A sore head on me today, bit too much wine out for dinner last nite, throw in a few Guinness and Red bull and it was a disaster.Up at 8am, got a breakfast sandwich and it took another hour for me to wake up,The rain had started but I needed to get out to move all the stuff from around the house for the lads to put in the footpaths.
Dad came over but since Sean had not apppeared with the digger it was akward to move.Sean arrived over and he told us that the ground was not high enough and that we would have to move back all the stuff!!We called it a day as we had to go to a birthday party.
RE COMMENT JULIE - Email me on aidangill@gmail.com and I can answer your questions.
July 07, 2006
Dinner time
July 06, 2006
July 05, 2006
July 04, 2006
Working late
July 03, 2006
Sick in the head!
He also bought in a load of timber to make shelves for the closet, hot press etc.I was at work until 8pm, mental busy and no time for anything, had a busting migraine also so had to head.
July 02, 2006
Matching it in the heat
Headed off to the match and drew in what seemed to be serious temperatures, was with the C team so I am not as pushed at winning the league with them as the B team.Back to the house and I decided to test drive the power showers!!!
I said since they were all cleaned up and hot water was there, what the hell!! Reminded me of a hotel shower with the power of it!Back to the boards and skirting, final coats and they are ready for Dad to tackle tomorrow.I decided it was time to also sand and varnish the skirting in the 2 bathrooms. Headed off at 7.30pm
July 01, 2006
Splashing about
June 30, 2006
?Nothing done!!
June 29, 2006
Match
June 28, 2006
Late @ work
June 27, 2006
Lights up
June 26, 2006
Still floored
June 25, 2006
Dismantlers in the heat
That took me 2 hours to do and pile up all the timber. All tanalised timbers so worth keeping.I moved into the hall again and worked away until 6pm. I have now left it with 3 lines to do.
June 24, 2006
Late nite, but no drink!
It took a good while to get the timber laid out and by then Brian had arrived to commission the Geothermal and sign off the system.Dad arrived over and we decided we would start and dismantle the timber panels at the side of the house, as they were in the way.
So with nail bar and hammers we got stuck into it and after 3 hours we had 2 of the panels done.Was 6 bells so Dad headed off and I moved inside to continue the timber. Also timbered into the closet so that was done also.There are 20 lines of timber to go down and I had 10 done by the time I left @ 10.30. A long day but the work is getting done.
June 23, 2006
June 22, 2006
Match nite
June 21, 2006
Painting come to an end!
June 20, 2006
Self leveing
Training at 7 so went to it and went back to house, took down the skirting and labelled it, swept and hoovered the floor and started mixing. I was very suprised that it took all 5 bags and just about had enough but it should do the job now.I also purchased 4 wall lights on the internet, got them for 40 euro a piece.
June 19, 2006
Flooring dining room
June 18, 2006
Painting
Speaker Cable
June 17, 2006
Great Progress
Using the stiff underlay as a template and cutting around the stone to get the exact shapes and angles.Pieces were taking me 20 minutes to cut around the hearth alone!So I got the 6 bags of leveller and was back in time for John. After the guided tour of progress we decided to work together and get the sitting room pulled and with one measuring installing and the other cutting and gluing we put in the final 11 lines in 2 hours.
Delighted to get it done so fast.
A bit ahead of myself now.Dad was over and he put up all the skirting in the back bedroom downstairs and filled the screws. The screws we were using and were useless were not threaded to the head and this meant that we had trouble driving the screw in.John had other screws with a full thread and they worked a treat.Myself and John decided to move the chop saw into this room and clean up the dining room. With the skirting off and numbered and the room hoovered I started with the leveller. It took 3.5 bags of leveller.
So I will start flooring that in the morning. I have a match at 12pm so that will break up the day.When I had that done I decided I would make a start on sanding and varnishing the skirting in the sitting and dining room. At least it will mean that we can put up the skirtingin these rooms.After a long day and my legs falling off I headed about 8.30
June 16, 2006
Selling the Motor
Then back to the house, aim this weekend is to get the sitting room floored. It was going to be extremly difficult due to the corner fireplace with the semi circular hearth so as you can imagine the cut are on a jagged stone curve!The self levelling cement had dried but it was not a great finish, not sure if it was down to the cheaper brand levelling compound or not.
Also a tip if u are using this stuff, tape around the edges between the floor and insulation as there were some gaps betweens ours which the leveller flowed into!! So a bit of masking tape will stop this and keep the floor level.I started the floor about 7pm, I knew it was going to be slow but by the time I left @ 11.30 I had 7 lines completed and was 1/2 way around the hearth.
With the dormer window and its angles it made it even more difficult to close the gaps between the joints and get leverage but a nail bar aided in this.At least its a start and all going well tomorrow evening it will be finished.
June 15, 2006
Levelled the sitting room
Levelled the sitting room
June 14, 2006
Clearing the dining room
Took down the skirting all around and hoovered out.He headed off again and I went into the back bedroom and steel wooled the skirting and gave it it's final coat of varnish. Took the TV with the German match on it upstairs to the main bedroom.Time to started finally putting in place the skirting. Slow job and with a stud finder(which cost 70 euro but is shi*TTTE!!!) and a drill with a small bit to find studs I on;y managed to get 5 pieces in place before my battery died a death!Off home about 11 again.
June 13, 2006
Tough training - hurts the bod!!!
June 12, 2006
Getting my block made!
June 11, 2006
Long night!
Time to finish the landing flooring, this was a pain in the arse and took me near 4 hours to finish!! Siobhan came over with some food and I sat and watched the match and then steel wooled and varnished all the skirting again.At 5 I moved downstairs to the bedroom, worked out the cuts and withing 2 hours I had 10 lines done in the room which was excellent. The only problem was that I smashed the knocking block!!
June 10, 2006
Very good progress
Then off into Arrow to pick up some self levelling cement @ 20 euro per 25kg bag.Back to the house, Siobhan was over so we took down the skirting in the bedroom, labelled it and then she cleaned up the floor. I headed out and started sanding the beam. Took me an hour once I figured out how to put on the sandpaper!!I does look well thought. I then headed up stairs to have a bit of lunch and also the watch the soccer.
While I was up there I also decided to put up the frosted contact on the window Sean asked up to blank out as it was looking down on their sitting room. In order to watch the match I then decided to sand and varnish the skirting off our bedroom and hall.Off downstairs again and got stuck into levelling.
The mix is mixed very watery so that it can flow over the room and it is encouraged into corners and sides with a steel float. It took all the bags I had bought but it means I can start that room tomorrow.Off home about 7 as I had to go to Larrys mams anniversary mass.