March 05, 2006

Walls tiled

I havfe a match @ 12pm so went to house for 8.30 with the aim to get the walls finally done. I manged to get 99% of the wall completed, headed off & played the match, lost ! and then back to the house.
Brian was there showing a number of people the heating system and Siobhan was there sanding the door.
After spending time talking to both and with Gerry ?& Emmett out to show me his new A4 I fianlly got around to tiling around the box in the wall!!
Cleared out the floor, swept it up and left it ready to tile.

March 04, 2006

1 more wall done

Sat - Not as cold today but the aim was to get the ensuite walls completed. I had to go into town to pickup a new silicon gun as the "new" one I bought had broke after a week!
Also need a tenon saw for cutting the bottoms of the architraves, will save us have to take them down again. Also a punch for putting away the nails so that that we could varnish them
In the end it was almost 11am when I got there, Shane was there to collect some stuff, after he left I tried to start the tiling but the electrician came so I was a while talking to him!
Then he needed to put in a fan in the ensuite so I lost time there, Dad arrived then and Siobhan. Dad continued with the door and Siobhan did a bit more painting.
Brian the spark arrived and we wired up the oven and went through all that had to be done.
Eventually I managed to start and get one wall completed, moved onto another wall which had the cuts for the shower control, the shower head & the door,
I got that wall done, so one `1/2 wall left now to do tomorrow.

March 03, 2006

Getting there

Another freezing day., outside anyway, the geothermal is working away and at least the house is lovely and warm.
Dad and Siobhan were over when I got there, herself was there to repaint the utility.
Dad continue with fixcing up the door and architrave.
I did another wall of the ensuite, should have it finished tomorrow all going well.

March 02, 2006

Enroute for the ensuite

Training tonite,. I decided to head to continue the tiling in the ensuite, got another wall done. Dad was over and put timber trims in around the glass blocks in the wall in the ensuite.

March 01, 2006

Off for the soccer

Ireland on the TV against sweden so I headed home after work

February 28, 2006

Eircom Contact

Finally got the letter from Eircom for the installation. Training tonite so no work done.

February 27, 2006

Tiling at last

I decided to start tiling upstairs ensuite. I managed to get one wall tiled., slow as there were cuts around the sewage pipe and access door. Dad was over to continue with the architrave and finishing off the doors.

February 26, 2006

The glass wall continues!!

I went to the house about 10, I had a match @ 2 so I would only get a couple of hours work done. I had to take down six blocks and rebuild them, pain in the head.

February 25, 2006

Various task

Up nice and early and in the house for 8.30, sparks meant to be here today but no sign! I decided to try and clean up the hall and bring the tiles and all tools upstairs out of the way.
I had to go to Hursts to get the blocks and I also had to call out to Shane for some adhesive and a tile cutter, got back to the house for 12.30
The floor around the wetroom needed to be rose so I did that with 2 buckets of sand and cement mix.
Dad was over and we brought the bath upstairs, we did some checking it out and realised that with the spa motor etc that we would leave it to the plumber to do it.
Siobhan came and did the final coat in our bedroom, dad worked and did the architrave in the ensuite so that I could get tiling.
I measured up the ensuite to make sure that all cuts and borders would fit in correctly.

February 24, 2006

Blocking it

Dad was over today as the tiles were arriving, he also wanted to get the skirting done.
I was stuck at work until 8.30 with issues to fix, Siobhan was off today and decided to tackle the 2nd undercoat in the hall.
I got to the house, had a cup of coffee and worked away, I built another 3 rows of glass block, only another 2 rows to go now but I have to get some more blocks and spacers.
Headed off about 11.

February 23, 2006

Training again

Training again tonite, on the track and pitch, stamina work this time of year, the old Xmas dinner should be run off now!! No work on the house.

February 22, 2006

Glassing it

I decided that I should get stuck into the glass blocks,
I did 3 rows of five and semi pointed them as I am going to use a normal white grout to give a better finish.

February 21, 2006

Hard training

Training tonite @8 on omni grass, killer of a session but supposidly all worth it!!!

February 20, 2006

Painting and Sawing

Dad was over today, he was at the saw, reckon he has managed to get the saw line spot on now. He is off to Beaumont again for a check up tomorrow,
I decided to paint the kitchen around the units, this needed to be final coated. The ceiling needs another coat so will have to do that and finish the cutting ins.

February 19, 2006

Tiling

Herself was out last nite so I had to bring her to her car in Westport, I arrived @ the house at 10, I decided I should add another layer of glass blocks on top to see if these would set. I will leave it at that for a few days to be sure to be sure!!
I then started work at the grouting of the kitchen tiles, Dad, John G & Siobhan arrived over and they were at the skirting and painting the landing.
It took me until 7pm to grout, clean, touch up, clean, re clean, then clean down the worktop, clean the tiles again!!! But at least they are done now!!!

February 18, 2006

Long day

Out of the cot @ 7am, thought I would get myself over early, intention was to get to see the United V Liverpool match @12.30 and I also have training @3pm for 2 hours so the day will be killed!
I started to finish off around the windows for the kitchen tiles, cutting trim and that until I realised I had run short, great not!!! I had to remeasure the bathroom downstairs and I headed off into town to Tubsntiles to get extra trim and finalise the order.
I also went to Castlebar toolhire to get a hand plane, chisels, sliding bevel and bits.
I called into a filling station for lunch and got 20 minutes of the game but had to head again. I got back to the house and then headed to training. Suffering badly with shin splints so the hard ground was killing me, but 1.5 hours of astro was a bit easier!!
I got back to the house @ and Dad was there with Siobhan, herself was painting the landing, not happy with the color, darker orange than what we expected. MYself and Dad got stuck into the glass panels in the door frame, at least it looks a hell of a lot better.
They headed off about six and I continued with the trims around the windows, had a bit to eat and set to the glass blocks, was not sure if I would face the same issues again.
The mix for these has to be right, then you have to make sure that the blocks are plumb and level each and every way, I put a metal strip screwed to the wall and through the blocks for extra support, I only did 5 blocks and pointed these in 4 hours!!!! Talk about been slow!!
I headed off home about 10,30pm, busted tired!!

February 17, 2006

Keeping the romance going!

We are off for valentine dinner, better late than never!! Off to the Tavern in Murrisk, a great feed. Dad was over to get the skirting done but there is issues with the chop saw.
We did go to TubnTiles to get our tiles picked out, got the ensuite and main bathroom done. I picked up the glass in the morning from Lawless, the 4 double glazed side panels were 140 notes, but the leading in them is identical to the door.

February 16, 2006

Training again

I am back to training, a killer, especially on my shin splints, can barely walk!!
I sweet FA on the tiling, wrecked!
I rang Lawless today, glass for front door frame is ready.
I also rang TileSavers and nearly lost it, it seems they still don't know when the tiles will be ready, 4 deadlines and no tiles so I pulled the plug on it all, cannot be fuking people about,
Soo off to tile picking again, splendid since I lost the yardage measurements of all the rooms!!!!

February 14, 2006

Glue It

Tueday - The glue for the timber finally arrived with the courier.
I was buckled in the evening after doing the papers so did not intend to hang around too long but I had to move the packs of timber to allow dad to get into the access door in the landing.
I then started at the tiling, down now to the 2 windows now to tile ~and then grout the lot.

February 13, 2006

ESB Again

Dad was over today, had to really as Hursts were arriving out with the corner bath and the replacement shower door, gave us a corner instead of a quadrant door!
So he then decided to continue with the access doors, managed to get the one in the main bedroom and ensuite done.
I arrived and continued with the tiling of the kitchen, down now to one side of the window and around the 2 windows. Heat is a killer in the house now!
Esb came out and replaced the metre with a dual day/night meter

February 12, 2006

Papers again

Doing the papers again this morning so up at 5.15am, got the papers delivered for 8:30 and headed off to bed again.
Headed to the house at 12 and went at the tiling in the kitchen again. Had Siobhans Dad, sister, brother in law and Nephew and Dad & John called in to look at the kitchen
Siobhan got stuck into painting the first coat on the wall where the new door was put on.

February 11, 2006

Demon Drink

Bit of a sore head today and with my motor in town Siobhan had to bring me in, did not get in until 11am.
Had to go to Tubs and tiles to pick up the kitchen tile. I got to the house about 12.30, hard to get motivated but the house is so warm it is great.
I decided to start tiling the kitchen walls, dad was over to setup the radial arm saw which I bought on Ebay. He also wanted to get the trapdoor in the attic and also get the roof space access doors closed up. He mad all of these out of a sheet of MDF with a bit of architrave for trim.
Siobhan was over also to get the kitchen first coat finished but we were working around each other which was not great.
I had a match at 6:15 against Westport United so had to head off early, we won 4-1 which was grand.

February 10, 2006

Noting done

Heading out tonite, Larry is over so going for a few pints so I did not manage to get anything done.

February 09, 2006

Lights and papers

Working the papers again this morning.
I was @ the recess lights again, all filled now and painted bar one. Have to go over the kitchen again as I am not overly happy with the amount of light which is escaping around the side.

February 08, 2006

Bath and shower

Bath and shower door arrived today but the door is wrong, have to get it returned. Still no sign of the tiles from TileSave, getting annoying at this stage.
I refilled the lights which I had pre filled, the filler is excellent and before it all dried I went back with a steel float and water and smoothed it off.

February 06, 2006

ESB Will Be Out Again

Peter called to the house and took out the mixer valve, he was meant to to put in an air release valve but he did not, should not be an issue.
I rang the ESB about the meter and they will send someone out during the week.
I decided to try and finish off as many of the lights as I could, also had to fill the large hole left when the lads moved the emergency light. It took me near 4 hours to fill the holes that needed filling and the others needed to be cut flat with a painters knife and then sanded.
The gypsum filler I got was much better than the polyfiller, finishes much better.

February 05, 2006

Papers For All

On the papers this morning, said I would get to Castlebar for quarter to six so got up at 4:50am but the papers were late and did not get in until 6.30am still I managed to get done and back into bed for 8:20am
Went to the house for 11am, the job I had done with the skimming the night before actually worked and it meant the 2 lights I had skimmed around looked spot on, I fired on a coat of paint and it did a great job.
I then decided to take this route with them all, there were 3 new holes to fill and 21 others to fill around. I spent the day at this.
Siobhan was over and painted the first coat of the kitchen, it looks well.
It took me until 5pm to get all the lights filled but they will need to be sanded and possibly a small skim put on some of them, at least it looks like an annoying task is coming to an end.

February 04, 2006

Great days work

I rang Peter the plumber first off, he said he would do the job on the mixer valve for me, Dad talked me out of doing it last night! Better off, I still decided to drain the system myself first.
I decided it was time to do some work on the front door, it had not been sealed so I got out my tin of sealer and gave it and the door frame a coat of sealer. There was also a gap at the bottom of the frame so I filled this with mastic.
The dehumidifier is working away full time, it is pulling out maybe 2 litres of water a day, once the heat goes on I am sure this will be a help.
I went to tubs and tile and got us our kitchen tiles, only 3 sq yards so it was relatively cheap. Main tiles are not in until Wednesday.
Siobhan and Dad came over, Dad had over with him the wet saw for the tiling, the radial arm saw and the double oven.
We got the oven in place for the lads to wire up.
I also started at the recess lights holes, still not happy with them so I decided to make up a light skim and plaster over it
Siobhan taped around the windows of the kitchen so that I could under coat them. We are aiming to begin painting the final coat tomorrow.
I also checked the main meter and sure enough there is only one, have to get onto them in the ESB to sort it out,

January 31, 2006

Doctors Visit

Off to the doc, throat and cough is no better and with training starting I need to get back to health

January 30, 2006

Water in the house

I rang Peter to get his lads to plum up the mains water. He did it so that meant we had water in the sinks, another mile stone!
I did not wait long, I took measurements off all the windows and went online for the prices.
I decided to take down all the glass blocks and get some advice.

January 29, 2006

Shaking Off The Flu

I got up this morning and headed off about 10am, it was badly cold. I inteneded to finish the glass blocks but when I discovered that the mortar had not dried and did not look like it would I decided against it.
So I then decided to starting sanding around window, doors, ceilings etc etc, pain of a job but it has to be done.
Siobhan was over and did a bit of painting, her mam & 2 sisters came for a guided tour so 3pm was not coming along too long.

January 28, 2006

Busy Day

Feeling a bit tired today, was home for 4am from Galway Dog races, great nite.
We went to Skye furniture first to get the bed and chest of drawers in the sale, 15% off.
Got to the house for 12, great sunny day. Intend to get the glass blocks built today, but I had 3 visitors which between them all took up near 2.5 hours!
Mick was over for a look at the house but as he said himself the details are on the blog so that is handy. That site for the LCD tv is www.Katronics.de

I had another Mick from across the road over and then Vinny and young Adam came over for a look. Siobhan got some tiles and testers for the kitchen. we had a few sarnies before we tried some tiles, it is hard to match up the kitchen, worktop, walls and black windows, still a great headache!

Actually for Marks sake I who said I put up the wrong name, meet him at the wedding last weekend and then again last nite in Galway, his name is Mark Jackson and he did or timber frame kit erecting!! Sorry Mark!!

I managed to get started on the glass blocks but it is a pain in the arse, had to leave each block lenght ways and width ways and then point between them, only managed 12 blocks, I know useless!!

So tomorrow I might get more done.!!

Plumber has all the house plumbed up for the water but has not connected it outside!!
Spark will be back Monday to finish off.
Geo Brian rang me and said that there was an issue with the pump but he will be back Tuesday.

It is funny now with the lights on in the house, you forget, so long used to having a lead and bulb that I forgot I had lights outside and in!!
Also the door bell works! It is a great buzz when you get to this stage.

January 27, 2006

Just Gone To The Dogs!!

Off to the dogs in Galway with the lads of Celtic B team, excellent nite, there was no house as you can imagine!
Brian was there alright and has a good bit done now. Plumber was there also

January 25, 2006

United On Box

Plumber turned up today, thank fup, not going to be ready for tomorrow, but they will be ready soon enought.
Brian was there working
Nick called over for a look at the house, changed a bit since he was last here!
United on the old TV so off to look at it!!

January 24, 2006

Paper Boy

I was doing papers this morning with Dad. I then went to Hursts to get the 40 glass blocks and 2 bags of adhesive, one burst in the boot!
Dad rang me, he was talking to Sean and he asked if we could move the 3 bales of blocks away from the front to allow him get in with the machine.
I got to the house and took in the glass blocks. Siobhan arrived for a while to do some cleaning up and to admire the kitchen ;)
I managed to get the 132 blocks moved out of the way.
Did sweet feck all after that.

January 23, 2006

Filling The Site

Sean rang me today, he has got his hands on a few loads of fill for our site. Great job, will help to rise the site.
I got tot he house to clean up the kitchen, Brian and John were there 2nd fixing the electric, manged to get our first lights on, great buzz.

January 22, 2006

Sore Head

Called in to see the lights but nothing turned on, not sure why.

January 21, 2006

Wedding Day Off

At a wedding today, sparks meant to be there in house today to wire up and switch on the power.

January 20, 2006

Kitchen nears completion

Paul was there today to finish the kitchen but due to his motor breaking down he did not arrive until late and did not manage to finish it.,
I eventually got Siobhan out to the house and suprised her with the new kitchen.

A few pics of the kitchen, needs to be cleaned up and 2 doors are missing either side of the window.





January 19, 2006

kitchen goes in

Got up this morning early to get the Gas hob over for Paul, I suspected John had been there plastering as I smelt smoke, but biggest give away was the key in the back door!!!
I rang Peter about getting the water hooked up so that Brian could setup the heat pump. I then rang Brian2 to see if we were ready for kick off next Thursday. seems we still are.

Rang Paul to see if he got to the house ok, he did so I let him away with it. He told me he needed the dishwasher on site so that meant a 32 mile round trip home to get the dishwasher, then back over again with it,.
I arrived back at 8pm, Paul was still there and I was very suprised with the work he had done, had all the floor and wall units done, pelmit done, work top finished, doors hung, all in 10 hours! Unreal but hey he is the pro!!
I must say it is money well spent.

Spent a while talkin to a fellow boards and self builder Steven. Learned a bit more about air vents in our house, or lack of them!! My fault!

Brian the spark was still sick but intends to set us up on Saturday.

The next 2 weeks are vital, it could mean we have water, electric and heat in the house. Time will tell!
John had the wall plastered too so we wait 2 weeks, paint it and then put up the stairs, even though i think it maybe longer as I want to totally tile all upstairs first.

January 18, 2006

Getting kitchen to be installed

I contacted Regina In Alpha kitchens for a few numbers I managed to get a hold of Paul, rang him and he was free tomorrow, no price mentioned but I know it will cost us about 600 euro for the 3 days work.
So I have to get the plans to him for 9am.
I did not go near the house today as United were on the box and my dad is out and home so headed for the heat!

January 17, 2006

Paint - Plaster, Flu, kitchen!

Thomas rang me today, kitchen doors are ready and he reckons it will cost me 700 euro to get the kitchen installed. Now anticipated but I think I need to get it done.
Got a hold of John, he will be over this evening to check what has to be done.
Heat pump not due now until Thursday week.
Regina and Tommy arrived about 7 with the doors, one was damaged so they took it back. Doors look nice.
John called over about 8, was in the middle of painting, went through what had to be done, he hopes to tackle it before weekend.
I painted the 2nd coat of the main bedroom upstairs, a bit of touching up to do around edges, ceiling and sockets.
Headed off about 10, totally fupped now with this flu, might have to pay a visit to the doc.

January 16, 2006

Slowly Moving!

Arrived in at about 7, decided that I would seal the porcelain flooring, this is a tin of sealer which is applied with a cloth.
I am now seriously considering getting Thomas to install the kitchen, without dads help I will not be able to do it on my own.
Tried ringing John to get him to plaster inside the door but no dice.
Moved up to the front bedroom upstairs and painted the 2nd coat of the final coat. Want to start ticking off each room as regards painting now.

January 15, 2006

Short and sweet

Still freezing but sin e! , I was working at 5am this mornin, doing the papers for my dad, got absolutely drown wet but managed to wrap it up fairly rapid and got back into bed at 8am.
Did not raise my head until 12! Headed over and put up the plasterboard around the door. Said I would try and sand down the recess light holes. Then it was time for a clean up in the hall, brutal after all the sanding, planing etc.
I headed off again at 4.30, a big indian feed to look forward too!!

January 14, 2006

Door goes in!

I headed over about 9.30am, bleeding cold again today, Brendan will be over about 12. I decided to cut in the front bedroom upstairs, had to sand around the sockets also.
I got the door area ready and cleared up for Brendan and we set at it when he came. We had to make sure the hinges were ok, which they were.
The door needed planing on the top of and side but it closed a dream. We then had to take some off the bottom so that it would close ok.
We then put down the draft excluder and the lock and keeper, all in all it took us 3 hours, way more work to it than I expected but when you are a carpenter he made it look much easier!
There is 4 glass panels in the timber door frame, I do not yet have the double glazed glass so I had to cut out 4 panels of timber to pin them.

I have to cut out the plaseter board for it and put it up around the door and it will be ready for skimming, excellent, have to get onto John now.

January 13, 2006

Glass Walls

Not much done today with the house, I arrived on site about 6pm, the door issue is still bugging me, wheather or not to hang it myself or not, with Dad out for what now could be up to 5 weeks this really has messed things up, but I as long as he is ok and today op went well that is all that matters.
I had one glass block to put in, the reason I left one was to see how strong and solid the other were with this FIXIT adhesive. It was spot on.
I decided to pain the final coat in the back bedroom upstairs, Siobhan had the walls done but not the ceiling so I scooted around it with the roller and painted the ceiling and gave the walls their second coat.
During my work I had an idea about the door, a neighbour of ours had offered to do some work when I had fixed their PC one nite, so I rang him and he said he would be over in the morning.

Headed off about 9.30

January 12, 2006

Back to the soccer

Meet shane at TileSavers at 9am, there was no one there but we waited and they arrived about 5 past.
I had all the measurements worked out for the new order, decided to go with a different tile for the ensuite now and use the London Marfil in the two bathrooms when they come in.
So i left in the order and Shane rang me later on, the order was going to be 300 euro more now as the border tiles were dearer so we left it. Have to wait for the other tiles

Decided to go back training tonite, soccer at 10pm on the Astro so I decided to head home and get some dinner into me.

January 11, 2006

Tiling Mess

I did not do much today, had to go out to Shane with the cheque for the tiles. When i arrived out Shane said that the order on that tile only would not be in for 3 weeks, great not!
Have to rethink what we will do.
Home to work out measurements and ideas again!

January 10, 2006

Light - Well almost!

God said let there be light and there was, sort of! The ESB rang me this morning
I arrived at the site about 7pm, still have this flu but will hammer ahead anyway. I decided to complete the glass blocks in the ensuite wall and then paint around the edges of our bedroom.
Took me 2 hours to rap it up!

January 09, 2006

Nothing done again

Dad in for his op today, should be off home today but they discovered someit when they were at him and said they needed him for more tests, it is not serious but he will be operated on Friday and will be out of action for up to 3 weeks.
He is not happy at all!! BUt what can be done
I had a busting migraine so did not get near the house, I rang ESB, still no cert, I got back onto the spark to send it in AGAIN!

Nothing done again

Dad in for his op today, should be off home today but they discovered someit when they were at him and said they needed him for more tests, it is not serious but he will be operated on Friday and will be out of action for up to 3 weeks.
He is not happy at all!! BUt what can be done
I had a busting migraine so did not get near the house, I rang ESB, still no cert, I got back onto the spark to send it in AGAIN!

January 08, 2006

Filling to hoooles

Still cannot brush off this cold, was over about 10am, freezing cold and fog so not very nice, had to call into see Dad, he is off to Dublin for his procedure.
I finished off putting on the trim on the timber ceiling.
I then moved into the sitting room and attempted to try and get the holes from the recess lights to look ok but this is harder than I expected!
Too me about 1hour to do the work, then I decided to move into the main bedroom and start installing the glass blocks in the wall, said I would do 6 blocks today and 6 again as they were been built one on top of the other.
Again took maybe an hour, have a rapid set glue which I used to set them, have to add a timber trim later on.
It was time to measure the 2 bathrooms and sun room for tiles and trim, have it all measured up so hopefully it will be spot on.
Went home about 2om as it was killing cold and my throat was at me,

January 07, 2006

Timber, painting etc

Woke about 9am, cold seems to be gettting worse but have to plod on or we will never get in!! Had to go to Dunnes Stores to get some hospital gear for dad. then into Heiton buckleys to get screws for the jams.
I also picked up the trims for the ceiling in the sun room.
HAd to head to Castlebar tool hire and got 3mm drill bit to drill the screws for the hinges.

I manged to get to the house about 12am, got my hands on a bottle of special mix for the cough...

With motivation levels at an all time low I started to sand the ceiling in the sun room, got the "mouse" sander, it looks better now. It was as well to paint around the edges before I starting putting on the edging,
Herself came over, also got the cold so it was not a great idea, She decided to start to undercoat the final room in the house. In fairness the house it moving along nicely, but it is a lot of small steps.

I moved into the sitting room and go my angle grinder to sand the recess light holes, this is really tunrining into a nightmare but hopefully it will be sorted.
Had Marie and Emmet out for a look and once they had gone I decided to start and put on the trim, herself headed off home to get the dinner.
Trim was easy enough to do, had a mitre box so that helped with the angles, I left about 3 small sections to do, each lenght is 8ft long (costs about 8 euro per lenght).
Headed about 6 thirty or so.

January 06, 2006

Door Frame goes in

Manged to make it to work but was not in great form, Dad and Damien decided to take on the door frame and door. First off we noticed that the door is Mahognay, not teak as I asked for but it is too late now, seems we may have to paint it!!
They had a real issue that it seemed the frame was off! ~So that was there biggest issue, when I got to the house they had the frame in, Dad was not in the fred west of humour, Beaumont rang and told him that there might be a bed for him on Sunday, but to ring at 1pm!! What sort of
health service have we got, they expect someone to drive for 4 hours, then to be told there is no bed!! Give us a break

We got the hinges cut out and the door up but then the 2 battery screw drivers we had ran out, then two of the screws in the hinges we cut not get out and they broke!!
Soo in the end the door was just put up and pinned in place. This is going to delay us again but what can be done. Dad hopes to be able to get back to it in a week.

January 05, 2006

Back to the IT

Back to work whipee! Not, talk about not wanting to be there, not that I really want to be there even when I am in full health!! I chased up the spark about the ESB, he said the cert is gone in! We will see,
I decided I would finish off the little bit of tiling inside the door in the utility room, the cracked tile inside the door also had to be replaced, I would have gone lu la if I left it!
I then also put down some of the tiles at the back of the utility room, area will never be seen but the heatpump and cylinder still need a levelish area!
Off home now to cough and splutter!!

January 04, 2006

Sick as parrot - Part 2

Off again today, still got the flu

January 03, 2006

Sick as Parrot

spent the day in bed sick, think I should have taken it handier than I did over the last few days!

January 02, 2006

On to the tiling

No feeling too good at all, really should be in my bed but the pressure is on (self inflicted some may say!!) but I want to get the tiling done in the utility room and the kitchen.
Damien was with me so we headed off about 10am. After the first 2 lines I soon realised that I was going to run out of rapid set so I went to TileSavers and got 4 bags, costs a bomb, 50 quid a bag!!
It took us near on 4 hours to do 4 lines, don't really know why but it was a killer to do!!
Moved onto the utility room and it too was a dog to tile, ended up using every single tile, also I cracked one tile inside the door with the diamond blade on the angle grinder so not impressed!!
Gerry and Emma were out and Larry and his dad called so that spent some time.

But it was great to get that done, at least we can now progress to installing the kitchen.

One thing that i was thinking of last nite was how much the self build completly consumes your thoughts and life, I even forgot to go to a funneral of a local man, something usuallly I would have done.
99% of things are put aside as you set targets on the house, it is gas really, something that self builder will understand.

January 01, 2006

Happy New Year To All

Happy new year folks, hope it is a happy and healthy one for you all.

Dying again today with the flu, but I had to pull more of the floor, we were due for dinner in Siobhans parents house at 2pm so I had 4 hours to do as much as I could
I managed to get 4 more lines done so 13 down, 4 to do!!! The floor is relatively level, but there are a few areas which need more adhesive but at least the back is broke on it!!

December 31, 2005

End of year

Last day of year, little did I expect to be still working on the house on this date, honestly thought we would be in for Xmas but Cest la Vie!
I layed out the floor and left a 130mm stip under the units to ensure that I would end up correctly at the dining room door. I also have a decent size finishing tile which in important.
The tiles are been laid in a brick effect with a 300mm * 600mm tile

December 30, 2005

Disaster strikes

Trying to fix the disaster, no shops open until 10am, managed to get a hold of 3 bags of self leveling cement so that was grand and with the other 2 bags which had we manged to get
the kitchen and utility room leveled.
So sin é, time will tell, off out with the lads tonite so it cud be a late start tomorrow!!

December 29, 2005

Back to the grind

TOday we decided to start tiling the kitchen floor, it has been a while since I tiled, hope I still remember what I am doing!! Damien was with me so that was handy, we swept up and measured up but soon quickly realised that things were not good.
The first line I thought I might pull but then after 2 lines things were not looking good, some parts of the floor were level but too much was way off. Shane came with other adhesive and put the 5ft level, the decision was then made to take up the tiles, wash them and level the floor!!
A nightmare to say the least but it has to be done to make things look the part!

December 28, 2005

Tiling the house

I decided that I needed to hit the hoose today, I intended to start tiling but realised that I needed to re paint the ceiling, clean the windows and scrape the floor!! Before I knew it the day was near gone so I started to hide the pin nails in the timber ceiling in the sun room and fill them with wood filler.

December 24, 2005

Its Xmas time

XMAS off - Well I had to take the 2nd half of 23rd and the 24th off as I a was totally fubar, passed out and 17 hours later awoke from a serious sleep.
I have been told that it was due to the last 7 months of work. Hard to know!

December 22, 2005

Xmas shopping - cleaning kitchen

I was off today, killed with a flu, did not sleep well at all,

Told Shane I would meet him at 10 to collect the tiles, we dropped them off at the house, place is a tip but I had to head off as I had no xmas shopping done at all.

So I shopped for about 3 hours, also got spacers and trowels, sponges for the tiling.

Took a lot at the mosaic tiles in Tile Warehouse but 85 euro per sq yard, fup that!!

I got back to the house at about 3, I decided to start the clear the kitchen and prepare it for tiling, also have to work out the layout of the tiles, with spacings and make sure I end with a decent size tile at the end.

December 21, 2005

Off to Dublin

Off to Dublin with my dad to Beaumont, day procedure, well that is what I thought it was until all it turned out to be was a check up!! A chance to experience paying more money to the NRA toll bridges, journey cost me 8 euro sixty on tolls, a fupping joke on top of the car taX i pay.
Up and down in the one day so wrecked tired. Collecting the tiles tomorrow. Door cannot now be delivered until after xmas, not to worry!!!

December 20, 2005

Door picked up, horrah!!

the door saga is nearing an end, I think!! It was picked up this morning in Sheffield so we are expecting delivery on Thursday or Friday.
Dad was over for a while doing some of the architrave. Shane ordered the porcelain tile, so we will collect on Thursday.
United were on the box so I retired for tonite!! I have not done a tap in 3 days, must be a record for me!!

December 19, 2005

Door drama ending??????

The door saga has come to an end, then again maybe I should not count the chickens but, I sealed the deal on the door at distinctivedoors in the uk and it will be picked up tomorrow, not sure when we will get it,
Shane went to look at the tiles to see if the porcelain we wanted were 25 euro as we were told in the shop but he was right, they weren't!
So we have decided to go with a cheaper version, 30 euro per sq yard, lovely rectangular tile.
I did not do any work on the house as I was out at his house.

December 18, 2005

Hangover has a head

No hoose today, nursing a catastrophic hangover, not used to drinking with all the house work! We finished up at 7am this morning, the party was still going on when we left!

December 17, 2005

Xmas party time

Xmas party tonite, I know I am going to be wrecked as I was out of the cot at 7.15am, Sean rang me to see what time I am over at. Arrived before 8 and Micheal was there ready with the digger, also 3 sparks working away.
Lovely morning, fresh but no rain. Have to get down 4" of sand down on the pipes, then a covering of soil. I decided to fix the leaking tap at the back, hissing water out, replaced the ring and connection.

I moved inside and worked on doing the ceiling, dad was over also so we both worked away on it, sparks did all the recess lights, emergency lights and sockets. Cert also sent in so that is great, time will tell!!
I headed off at 4pm to get the auld fake tan done!!!

December 16, 2005

Work meeting, bla bla bla

Had to be at work for 7,30am so wrecked when I got the site, herself is in Dublin at their xmas party so I was in no rush home!
I got about 1/2 of the ceiling boarded, I want to get it done before the recess lights are installed. The sparks are in in the morning, the digger is also there to work to commence early!!

December 15, 2005

Timber the ceiling

No sparks today either, seems the lights were not delivered! Great.I started to sand some of the ceilings but the dust was a killer so I left it and started to put the tongued and grooved timber on the sun room ceiling.
Only did 2 lines, very hard on my own!

December 14, 2005

Oh sparky where art thou

No sign of sparks, meant to be here today, must not have got the lights. The door saga still goes on. Dublin door store now seems unsuitable so we are waiting back on the lads from Monivea.
I also have contacted the UK to see if we can get the door on its own and quicker.
Dad and Damien were over, they rehung the sitting + bedroom doors and returned the floor insulation and got the tongued and grooved ceiling boards.
United were on the box so I headed off home.

December 13, 2005

Another day off ish!

Damien was over with me today, spent a couple of phone calls onto work again today!
We started to put more 4" solids on their flat. Took 8 blocks to get the .8 of a meter of dept for the geo. Was freezing cold so took our time!!
The moved the big stack of timber to the gable. Dad was over. So it is great to get the back of the house cleared.
The guys in Monivea will do the door for 1k, but cannot tell me when it would be ready, not what I want to hear. Thanks T for ur efforts.

When Damien and Dad had headed off home I started to sand the filler in the recess light holes. I hindsight I think I did it arse about face, I think I should have not put in as much filler.

Noreen, Mam and the kids were over, liked the colors we have painted.

December 12, 2005

Day of work

Day off today, well off IT!!
Arrived over about 9am, bleeding cold as hell, the old brass liathroid of a monkey comes to mind!!!
Task today was to get the manhole built and to get the timber stack moved to the gable but like everything else it did not go to plan!!!
I started to clear the ground around the manifold but struck gold straight away, only joking, it was rock, but luckily with a bit of huffin and puffin I got rid soon enough.
Herself arrived over then and I got her a mix of paint. Decided to start painting the sun room with a creme color.

Dad also arrived and we did a mix of cement and sand and gravel for the base. Poured it in and managed to get a line of 3 blocks all around.

December 11, 2005

Nothin done

Was late enough over, it was 2.30am last nite when we left Tom and Siobhan after seeing naked camera in the TF so I was lacking enthusism!!!
I decided to start filling the holes of the recess lights and around the sockets and lights.
Headed off about 3.30 as United were on the bosca

December 10, 2005

Freeze the arse of ya

Arrrived over about 9am, again very cold. I decided I needed to get the whole of the back of the house tidied up and done. Started with the scaffolding, some of it was still up around the sun room so got it took down.
Started to stack it all then, was all over the house. Was strange weather, by lunch I was down to a tee-shirt, but within an hour back up to 3 layers!!!

Dad was over, we decided we would sort of the bags of rubbish at the back of the house and move it to the stack of rubbish. Then we started on the pile of cardboard, stick and slates.

Siobhan was over and gave the room upstairs a paint of creme and gave the sitting room another coat.

Got dark about 5pm so we moved inside. Dad headed off and I started to cut in around the sitting room and main bedroom.

Kitchen carcasses all arrived today, house is now packed!!

December 09, 2005

Another one bites the dust

We took a go at hanging the doors in the closet, what a pain in the ass, took us the guts of 2 hours to hang!! Enough was enough, off home for food!

December 08, 2005

Hang then doors

Dining room doors to hang, it seems double doors are bit harder to hang, nothing seems at all, put pain in the tits!

December 07, 2005

Not too well

busted tired and a banging headache so decided to head off home.

December 06, 2005

Night Off

United on the box so nothing done, rang about the door, will be ready!! ya ya ya

December 05, 2005

Hanging the doors

Kept at the doors upstairs, bedroom and wardrobe hung. Herself was over and starting painting the bedroom upstairs with the final coats of colored paint, it shapes the room well.

December 04, 2005

Timber arrives

Timber flooring due in at 10am, so was over for 9am. The stink out of the sealer would kill a man. I had to open up all doors and windows.
49 packs of semi solid flooring arrived, 3 rolls of underlay and about 30 minutes later we had it in, stacked in the hall.

I said I would move 20 packs upstairs.

Then did a bit of filling around the windows.

December 03, 2005

Guess what, NO Door

Fabulous morning, really sunny which is an encouragement! I decided that I should fill in around the geothermal pipes with sand to protect and to stop people from noising and potential damage.
I first rang warning tape over the whole area so if a digger decided to move and not realise the pipes were there they would be warned!
I presume 2 hours would be enough to cover the whole area with a lock of sand but it took me 8 hours of barrowing! I was in bits after wards, Dad arrived over and we buried the return and flow
from inside the house for the geo in the ground with sand, Brian has to return and lower the mainifold for the pipes also.

We decided to move inside to start some painting. Siobhan had already started on the sitting room and we decided to paint the 2 walls either side of the fire place with "Toasted Almond" and then the rest of the room with a cream.
When we had done the walls we started on the cream but quickly realised it was looking kak, we then tried another lighter creme but again we were not happy.

I left herself to it and i started firing on sealant on the doors, the skink was a killer and I could taste it on the way home!! We'll have every druggie around the house sniffing the stuff!!

December 02, 2005

Door

This door story is going to drive me mental. Rang them this morning, "Oh it will be ready, tell ur dad to come up" So excellent, dad arrived
up at about 5pm. Headed up and they said to go to MMH and pick out the locks and come back in 1.5 hours. We had a coffee and headed back to collect our door.

But fup me, when we arrived they were only cutting the door!! I nearly collapsed!! So we left, I will deliver it tomororow he said, ummm!!!

December 01, 2005

Collector

Brian was there with the collector loop for the geo.
We started at doors upstairs, 2 bedrooms hung and the hotpress.

November 26, 2005

Work For Dad

Was working for Dad this morning so up at 5.30am, papers were late so it meant I did not finish until 11am, so had a bit of breakfast and we agreed it was time to get the paint.
I went to the house, the electricians were there, wiring up the sockets and ceiling rose and bathroom lights.

November 13, 2005

Day Off

I got up about 9 and headed to the house to close up all the windows and to see the floor, sound a bit mad!!
I headed off home and I had to work with my car, there was a leak coming into the back seat for some reason. So I had to fix it, turned out to be 3 leaks, don't know how the hell these happend but I managed to seal 2, the 3rd I could not manage!

We took Man, Dad and Damien and Mar for food and took the evening off!

Couple of Pics of screeding now done and Geo area




November 12, 2005

Loads of work

On site for before eight, another wonderfully pissy day, up to our neck in shite!
Damien and Iano were with me and they wheeled their wheel barrows and filled the first room. Gerry arrived about 8.30 with some foddder and I contiued with the lads outside to get the percolation area marked out. We then tried to fit in the 280 sq meters, I can see where Sean was getting frustrated!!!
Eventually I managed to fit it, with almost an acre of a site how it was hard is hard to explain but with the biggest part to the front of the house it was a proper pain!!

The I had to get my mate John Grady to get 3" land drainage pipe for the percolation area.

About 11am and 3 hours after the screed arrived I started to screed. Damo and Iano had 1/2 the back room done which for lads who never did screeding they did very well.

Dad was late again and arrived by 11.30, at this stage we had the back room almost completed and Gerry had filled the sitting room, Ian & John were starting the sitting room and progress was rapid.

Dad and John continued with the sitting room and myself and damien pulled the backroom and back section of the hall.
We had a cuppa and decided to fire up as much as we could upstairs before it dried. The stairs was pulled out then and we started to wheel in the screed. In that time the pile had hardened so fair play to Sean he got the digger and moved it about the loosen it.
Then it was all hands on deck and we fired more screed upstairs so that Ian and Damien could continue to pull the rooms.

In the mess we managed to bury a platic float in the hall floor, a momento!

Sean, myself and Dad then managed to pull the hall floor and marry in the closet, sitting room, kitchen, bathroom and sitting room.
All done downstairs, great relief, the decision was made to push to get upstairs done, so we got 5 buckets and 2 upstairs, one on the ladder and 3 outside. The push was amazing, and within an hour we had too much upstairs!! FOur of us pulled a bedroom, hotpress and landing in 30 minutes and then back downstairs to pull up the screed guides and fill it in.
Antoher 10 buckts and we had all screeds up and all floors floated. So that was it!!

An amazing days work which has pulled the who house so much.

I had rang Brian Feeney my spark to fo the 2nd fit as u need cert to get your ESB connected. Will be this day week before he can come.

November 11, 2005

Kitchens, layouts + drink

Ordered the screed for tomorrow, Gerry will be there also.
We ordered the kitchen today from Alpha Kitchens in Claremorris. Got a great deal, 3 weeks until delivery.
Sean rang me, he was trying to fit in the areas for the Geothermal. We need to get an area of 280 sq meters into the site, so it was 10*28, 8*35 or what ever, Sean just could not fit it in, so after spending 30 minutes on the phone we decided to give up and leave it for me to look after tomorrow.
Wonderful so on top of a days work at screeding, I now have a days work of laying out the geothermal and organising the percolation area!

My mate Larry was home from UK for weekend with Karen his fiancee. So we meet up in Peggys, there was about 20 of us, I stayed on the dry as that was the last thing I needed for screeding!!
We headed off about 1am, 6 hours of sleep.

November 10, 2005

Digging is back

Digger on site for the ducting for the ESB and phone. Great to get it done.
Dad was with him and they decided to have a look at the water piping, big issue potential here but I will ring P Joyce to see the setup first.

Sean rang me and wants to put in the tank tomorrow, "while we are here", great blue arse fly syndromw! Rang Westport Concrete and got the figure eight tank for €680.

The beam for the mantlepiece is nearly ready.

Skye rang and want a date for the furniture, I said leave it until 30th of Nov, me arse we will be ready but just to keep them quite.

November 09, 2005

Ducting + Service

Dad and Damien were over and ran the pipe through the ducting for the ESB.
Still no sign of the guttering or answering the phone.
I had to service Siobhans car, had to be done as over the limit well.

November 08, 2005

Door Part2

I called into DOnnellans again about the door, was talking to John, he seems to think that this design will work very well and to give him a buzz on Friday.
I decided to paint the hall kitchen and sitting room walls which were plastered crap, my mate Colins dad told me to as it will either hide of bring out the flaws.
It actually looks alright!

November 07, 2005

Busy out

Rang Ray in the flooring company to get the timber, not in stock, will ring him next week.
Rang Eamon in NorthWest Guttering to finish off the job, will do it Wednesday.

I got a hold of company in the UK to do the door, it is now a square design with a gothic inset, shipping is the issue here now.

Dad and Damo were over, the cleared up the whole of the outside, rubble gone and all scaffolding and timber, great job.
They also moved all the stuff from the rooms which need to be screeded and into the screeded rooms,

Weather is windy and wet, late when I got to the site and went home, these dark wet nights are not great!!

November 06, 2005

Sore legs, head, bones!!

Today is off, tired and sore, great to be off, myself and herself went to the Tavern for a feed.

November 05, 2005

Screeding Begins

I picked the lads up about 8am, we stopped at a filling station and got some breakfast, was inside and Roadstone rang me, they were onsite, 40 minutes early, wonderful, also the fact that dad was running almost 2 hours late meant we were on our todd on this one!
I ordered 6 cubic metres to cover the sunroom, dining room, kitchen, utility and bathroom. At 104 euro per cubic meter then this stuff had to go in!

We wheeled in barrows like Molly Malones on speed and filled the sunroom and dining room, myself and Damien 2 then got our 2"*1" screeds in. You have to level this off the sole plate and then diagonal level them also.
I have a 5ft level so this makes life easy.
Dad arrived over so we got on our knees and worked away. Also managed to get 15 buckets up stairs but lost about 3 barrows as we had to go to my mates anniversary mass.

We meet up with the lads afterwards and we headed into Westport for the night.

November 04, 2005

Door Disaster

Arrived in Claremorris to view the door at 8.30am, suprised suprise the door is not ready and no sign of Finbar who makes the door, due in a 9.30am, not impressed.
They now claim that since we only have a height of 82" in the door opening that we cannot have that shape of a gothic door and that a square on will have to go in, why in the fuk they could not have figured out this back in June is beyond me!

I went onto boards.ie and posted the question if they are raving and onto another few places, placed a few calls and it seems these guys may not be raving. SO back to sq one!

Pain in my head again so went home to bed and get ready for tomorrow, Gerry has had to work also so we are one down, I asked Damien if he could get anyone so he managed to get his mate Damien 2 and that was great.

November 03, 2005

Friends @ home

Rang about the door, seems it is ready, the lads asked me to call up and pick the locks in the morning. Excellent.
Our friends Tom and Tracey are home from France with their 2 kids, great to see them and their lovely kids, Sammy and Gabrielle. Mattie and Bridie gave us great hospitality.
Headed off to the soccer at 10am in the pissing rain, need to get some sort of soccer under my belt!

November 02, 2005

Night Off

United V lille, night off!

November 01, 2005

Painting again

Arrived at about 9pm, did a bucket of painting.

Pic of landing