back to grouting
Grouting to be finished in the kitchen and the white grout in the bathroom to be redone. Slow job but that is the last large job done.
A diary of our self build In Co. Mayo Ireland. Blog. Covering all aspects of building your own house. Timber frame house, insulation, underfloor heating, geothermal, tiling, timber floors, doors, varnish, painting and slogging it out!!!!
Grouting to be finished in the kitchen and the white grout in the bathroom to be redone. Slow job but that is the last large job done.
Grouting to be finished in the kitchen and the white grout in the bathroom to be redone. Slow job but that is the last large job done.
Grouting to be finished in the kitchen and the white grout in the bathroom to be redone. Slow job but that is the last large job done.
Today was a late one, I had my first match at 12pm for the C team but the ref was late and we did not start until 20 past. So after a mad busy match we won 2-1.
Over about 8am, I gave the stairs another coat and then into town to get the Core bit and drill from Sam Hire for 30 euro to drill through the wall for the tumble drier vernt.
Started varnishing the spindsles again, slow job only 10 done! Gave the stairs another coat
Over for 7.30, sanding again, lose the skin on my fingers at this stage!! all sanding of the steps done bar 2.
A day of sanding and sanding and more sanding!! From 7am to 8pm. I had a "mouse" sander so that was excellent for the steps.